White paper 07 · Annex B
Glossary and abbreviations
This glossary explains the technical terms, institutions and abbreviations used in this paper. Where a French term is in common use in Cameroon, it is given with its English equivalent.
| Term | Meaning |
|---|---|
| AfDB | African Development Bank. Its Integrated Safeguards System (ISS, 2023) sets environmental and social requirements through ten operational safeguards (OS1 to OS10). |
| Airshed | The volume of air over an area within which pollutants mix. An airshed is "degraded" when ambient concentrations already exceed the applicable standard. |
| AQG | Air quality guideline level of the WHO (2021): the concentration below which health effects are considered minimal. |
| Area of influence | The area in which a project’s direct, indirect, induced and cumulative impacts may occur; usually much larger than the site. |
| Audiences publiques | Public hearings held on a finished detailed EIES in Cameroon, run by an ad hoc commission. |
| Bag filter (fabric filter) | Gas-cleaning equipment in which dust is captured on fabric bags; the standard technique for EAF fume. |
| Bagyeli (Bakola) | Forest peoples of the Océan department of Cameroon, recognised as Indigenous Peoples under international standards; their language is Gyele. |
| BAT | Best available techniques, as defined in European Union law; BAT conclusions set associated emission levels. |
| Baseline | The measured state of the environment and of communities before a project, against which impacts are predicted and monitored. |
| Blowdown | Water purged from a cooling circuit to limit the build-up of dissolved salts. |
| CAMS | Copernicus Atmosphere Monitoring Service, which produces modelled air quality reanalyses. |
| CBAM | The European Union’s Carbon Border Adjustment Mechanism, in its definitive regime since 1 January 2026 for iron and steel imports. |
| CCE | Certificat de Conformité Environnementale: the certificate issued by MINEPDED after a favourable review of an EIES. |
| CEMS | Continuous emission monitoring system, installed on a stack. |
| CIE | Comité Interministériel de l’Environnement: the interministerial committee that gives its opinion on an EIES before the decision. |
| Critical habitat | In IFC Performance Standard 6, an area of high biodiversity value meeting one or more of five criteria; projects there must achieve net gains. |
| Cumulative impacts | The combined effects of a project with other existing, planned or reasonably foreseeable developments on the same receptors. |
| DRI / HBI | Direct-reduced iron / hot-briquetted iron: iron produced by removing oxygen from ore without melting, used as clean metallic charge in an EAF. |
| DUP | Déclaration d’utilité publique: the declaration of public utility that opens the expropriation procedure. |
| EAF | Electric arc furnace: a furnace that melts scrap and other metallic charge with electric arcs. |
| EAF dust | Fine dust collected from EAF off-gas; classed as hazardous because of its zinc, lead and cadmium content. |
| EES | Évaluation environnementale stratégique: strategic environmental assessment of a plan, programme or zone. |
| EHS Guidelines | The World Bank Group’s Environmental, Health and Safety Guidelines (General, and sector guidelines such as Integrated Steel Mills, 2007). |
| EIES | Étude d’impact environnemental et social: the environmental and social impact assessment. Cameroon distinguishes the EIES détaillée (detailed) from the EIES sommaire (summary). |
| EP4 | The fourth version of the Equator Principles (2020), a risk-management framework adopted by financial institutions. |
| ERA5 | The fifth-generation global climate reanalysis of the European Centre for Medium-Range Weather Forecasts. |
| ESAP | Environmental and social action plan agreed with lenders and made a condition of financing. |
| ESMP / PGES | Environmental and social management plan (plan de gestion environnementale et sociale). |
| Établissement classé | Classified establishment: an installation subject to authorisation or declaration because of its hazards or nuisances. |
| Étude des dangers | Hazard study required for first-class classified establishments, covering major-accident scenarios. |
| FPIC | Free, prior and informed consent: the agreement of affected Indigenous Peoples, reached through good-faith negotiation, required by IFC PS7 in defined circumstances. |
| GHG | Greenhouse gases, expressed in tonnes of carbon dioxide equivalent (tCO₂e). |
| Grievance mechanism | A process through which people can raise concerns or complaints about a project and receive a response. |
| IBAT | Integrated Biodiversity Assessment Tool, a database for screening biodiversity features near a site. |
| IFC | International Finance Corporation, the private-sector arm of the World Bank Group. |
| Interim target (IT) | An intermediate air quality level in the WHO guidelines for places where the guideline is not yet met. |
| IUCN Red List | The International Union for Conservation of Nature’s assessment of species’ extinction risk (Critically Endangered, Endangered, Vulnerable, and so on). |
| KPIZ | Kribi Port Industrial Zone S.A., the company that develops and manages the integrated industrial zone of the Port of Kribi. |
| Ladle furnace | Secondary steelmaking unit in which liquid steel is refined and its temperature adjusted after the EAF. |
| MINEE | Ministry of Water and Energy. |
| MINEPDED | Ministry of Environment, Protection of Nature and Sustainable Development. |
| MINFOF | Ministry of Forests and Wildlife. |
| MINMIDT | Ministry of Mines, Industry and Technological Development, responsible for classified establishments. |
| Mill scale | Iron oxide that forms on hot steel and flakes off during casting and rolling; recyclable as iron units. |
| Mitigation hierarchy | The sequence avoid, minimise, restore, offset, applied in that order to adverse impacts. |
| Natural habitat | Areas composed of viable assemblages of largely native species, or where human activity has not essentially modified primary functions (IFC PS6). |
| NIE | Notice d’impact environnemental: the simplest environmental instrument in Cameroon, for minor operations. |
| Non-designated country | Under EP4, a country not listed as having robust environmental and social governance; the IFC Performance Standards apply in full. |
| PAK | Port Autonome de Kribi, the public company that manages the port and its domain. |
| PCDD/F | Polychlorinated dibenzo-p-dioxins and dibenzofurans ("dioxins and furans"), expressed as toxic equivalents (TEQ or I-TEQ). |
| PM10 / PM2.5 | Particulate matter with aerodynamic diameter below 10 or 2.5 micrometres. |
| Performance Standards (PS1 to PS8) | The IFC’s eight environmental and social standards (2012). |
| Post-combustion | Burning of carbon monoxide and organic compounds in EAF off-gas before cooling. |
| Quench | Rapid cooling of off-gas through the temperature window in which dioxins re-form. |
| Reanalysis | A model-based reconstruction of past weather or air quality, constrained by observations; labelled "modelled" in this paper. |
| Return period | The average interval between events of a given size; a 100-year storm has a 1% chance of occurring in any year. |
| Scope 1, 2, 3 | Direct emissions (Scope 1), emissions from purchased electricity (Scope 2), and other value-chain emissions (Scope 3). |
| Slag | Non-metallic by-product of steelmaking, formed from fluxes and oxides; processed EAF slag is used as aggregate. |
| Waelz kiln | Rotary kiln used to recover zinc from EAF dust. |
| WHO | World Health Organization. |
Source: Cameroon Steel, from the legal texts and standards cited in Annex C.
Cite this chapter
Cameroon Steel (2026). Building responsibly in Kribi: a steelworks can meet international standards on four conditions. White paper 07, annex B: Glossary and abbreviations. CS-WP-07. https://www.cameroon-steel.com/en/library/responsible-kribi/annex-glossary/