Contact

Language

From mineral resource to industrial value

White paper 07 · Annex C

Sources

Every source cited in this paper is listed below by its identifier. Sources are grouped by type. Within each group, identifiers follow the order in which sources were registered, so some numbers are not used. Web addresses were accessed on 10 October 2026 unless stated otherwise. Documents published by the Port Autonome de Kribi are cited by title and date only, without web links. Press articles are secondary sources, used only where no primary source was available; no encyclopaedia entry is cited.

Reading
13 min
Length
2,920 words
Edition of
10 October 2026

Cameroonian law and regulation (L)

ID Title Publisher Date URL
L01 Loi n° 96/12 portant loi-cadre relative à la gestion de l’environnement Presidency of the Republic (FAOLEX copy) 5 Aug 1996 faolex.fao.org/docs/pdf/cmr19578.pdf
L02 Décret n° 2013/0171/PM fixant les modalités de réalisation des études d’impact environnemental et social Prime Minister (FAOLEX copy) 14 Feb 2013 faolex.fao.org/docs/pdf/cmr179401.pdf
L03 Arrêté n° 00001/MINEPDED fixant les catégories d’opérations soumises à une évaluation environnementale stratégique ou à une étude d’impact environnemental et social MINEPDED (FAOLEX copy) 8 Feb 2016 faolex.fao.org/docs/pdf/cmr172054.pdf
L04 Loi n° 98/015 relative aux établissements classés dangereux, insalubres ou incommodes; Décret n° 99/818/PM fixant les modalités d’implantation et d’exploitation Presidency; Prime Minister (FAOLEX copies) 14 Jul 1998; 9 Nov 1999 faolex.fao.org/docs/pdf/cmr141675.pdf; faolex.fao.org/docs/pdf/cmr26717.pdf
L05 Décrets n° 2011/2582/PM (atmosphere), 2011/2583/PM (noise and odours), 2011/2584/PM (soils) and 2011/2585/PM (discharges) Prime Minister (FAOLEX copies) 23 Aug 2011 faolex.fao.org/docs/pdf/cmr195746.pdf; faolex.fao.org/docs/pdf/cmr195745.pdf; faolex.fao.org/docs/pdf/cmr195748.pdf
L06 Décret n° 2012/2809/PM fixant les conditions de tri, collecte, stockage, transport, récupération, recyclage, traitement et élimination finale des déchets; Arrêtés n° 001 and 002/MINEPDED Prime Minister; MINEPDED 26 Sep 2012; 15 Oct 2012 faolex.fao.org/docs/pdf/cmr195749.pdf
L07 Loi n° 98/005 portant régime de l’eau; Décrets n° 2001/164/PM and 2001/165/PM Presidency; Prime Minister (FAOLEX copies) 14 Apr 1998; 8 May 2001 faolex.fao.org/docs/pdf/cmr33974.pdf; faolex.fao.org/docs/pdf/cmr26656.pdf; faolex.fao.org/docs/pdf/cmr26658.pdf
L08 Loi n° 85/09 relative à l’expropriation pour cause d’utilité publique et aux modalités d’indemnisation Presidency (FAOLEX copy) 4 Jul 1985 faolex.fao.org/docs/pdf/cmr1474.pdf
L09 Nachtigal Hydropower Project, ESIA update, legal and institutional chapter (Décret n° 2003/418/PM crop rates; building valuation) AECOM and Sogreah (European Investment Bank register) Sep 2011 www.eib.org/attachments/registers/86536111.pdf
L10 Manuel de procédure générale des études d’impact et audits environnementaux MINEPDED n.d. minepded.gov.cm/wp-content/uploads/2021/09/Manuel-de-procédure-générale-des-études-d’impact-et-audits-environnementaux.pdf
L11 Arrêté n° 00004/MINEP fixant les conditions d’agrément des bureaux d’études MINEP 3 Jul 2007 minepded.gov.cm/wp-content/uploads/2021/09/Arrêté-n°00004-MINEP-du-03-juillet-2007.pdf
L12 Arrêté n° 0010/MINEP portant organisation et fonctionnement des comités départementaux de suivi de la mise en œuvre des PGES MINEP 3 Apr 2013 minepded.gov.cm/wp-content/uploads/2021/09/Arrêté-n°0010-MINEP-du-03-avril-2013.pdf
L13 Rapport d’évaluation du Système de Gestion Environnementale et Sociale (SGES) du Cameroun African Development Bank (published by MINFI) Jul 2026 minfi.gov.cm/wp-content/uploads/2026/08/Rapport-Evaluation-SGES_GPD-Durable-Cameroun.-REVSNSC-180826.pdf
L14 National consultations advance revision of Cameroon’s framework environmental law UNEP Law and Environment Assistance Platform Sep 2024 leap.unep.org/en/about/news/national-consultations-advance-revision-cameroons-framework-environmental-law
L15 Loi n° 2024/008 portant régime des forêts et de la faune Presidency of the Republic 24 Jul 2024 www.prc.cm/fr/actualites/actes/lois/7298-loi-n-2024-008-du-24-juillet-2024-portant-regime-des-forets-et-de-la-faune
L17 Loi n° 92/007 portant Code du travail Presidency (FAOLEX copy) 14 Aug 1992 faolex.fao.org/docs/pdf/cmr198304.pdf
L19 Décret n° 2020/251 portant réorganisation et fonctionnement du Port Autonome de Kribi Presidency of the Republic (copy published by the Port Autonome de Kribi) 5 May 2020 Cited by title and date
L20 Loi n° 2013/011 régissant les zones économiques au Cameroun Presidency (FAOLEX copy) 16 Dec 2013 faolex.fao.org/docs/pdf/cmr141879.pdf

International standards and guidance (G)

ID Title Publisher Date URL
G01 Performance Standards on Environmental and Social Sustainability International Finance Corporation 1 Jan 2012 www.ifc.org/en/insights-reports/2012/ifc-performance-standards
G02 Guidance Note 6: Biodiversity Conservation and Sustainable Management of Living Natural Resources (updated) International Finance Corporation 27 Jun 2019 www.ifc.org/en/insights-reports/2012/ifc-performance-standards
G03 Environmental, Health, and Safety Guidelines for Integrated Steel Mills IFC / World Bank Group 30 Apr 2007 www.ifc.org/content/dam/ifc/doc/2000/2007-integrated-steel-mills-ehs-guidelines-en.pdf
G04 Environmental, Health, and Safety (General) Guidelines IFC / World Bank Group 30 Apr 2007 www.ifc.org/content/dam/ifc/doc/2000/2007-general-ehs-guidelines-en.pdf
G05 The Equator Principles EP4 Equator Principles Association Jul 2020 (effective 1 Oct 2020) equator-principles.com/app/uploads/The-Equator-Principles_EP4_July2020.pdf
G06 African Development Bank Group’s Integrated Safeguards System (2023) African Development Bank 2023 www.afdb.org/en/documents/african-development-bank-groups-integrated-safeguards-system-2023
G07 Commission Implementing Decision 2012/135/EU establishing the best available techniques (BAT) conclusions for iron and steel production European Commission 28 Feb 2012 eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32012D0135
G09 WHO global air quality guidelines: particulate matter (PM2.5 and PM10), ozone, nitrogen dioxide, sulfur dioxide and carbon monoxide World Health Organization 22 Sep 2021 www.who.int/publications/i/item/9789240034228
G10 Addressing Grievances from Project-Affected Communities (Good Practice Note) International Finance Corporation Aug 2009 www.ifc.org/content/dam/ifc/doc/mgrt/ifc-grievance-mechanisms.pdf
G11 Projects and People: A Handbook for Addressing Project-Induced In-Migration International Finance Corporation Sep 2009 www.ifc.org/en/insights-reports/2011/handbook-for-addressing-project-induced-in-migration
G12 Workers’ accommodation: processes and standards IFC and European Bank for Reconstruction and Development Aug 2009 www.ifc.org/content/dam/ifc/doc/mgrt/workers-accomodation.pdf
G13 Guiding Principles on Business and Human Rights United Nations Office of the High Commissioner for Human Rights 2011 www.ohchr.org/sites/default/files/documents/publications/guidingprinciplesbusinesshr_en.pdf
G14 United Nations Declaration on the Rights of Indigenous Peoples United Nations General Assembly 13 Sep 2007 www.un.org/development/desa/indigenouspeoples/declaration-on-the-rights-of-indigenous-peoples.html
G15 Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and their Disposal; Bamako Convention on the Ban of the Import into Africa and the Control of Transboundary Movement and Management of Hazardous Wastes within Africa Secretariat of the Basel Convention (UNEP); African Union 22 Mar 1989; 30 Jan 1991 www.basel.int; au.int/en/treaties/bamako-convention-ban-import-africa-and-control-transboundary-movement-and-management
G16 Commission Implementing Decision (EU) 2022/2110 establishing the best available techniques (BAT) conclusions for the ferrous metals processing industry (BAT 22, Table 1.9: feedstock heating in hot rolling) European Commission (Official Journal L 284, p. 69) 11 Oct 2022 eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32022D2110
G17 Best Available Techniques Reference Document for Iron and Steel Production (EUR 25521) European Commission, Joint Research Centre 2013 bureau-industrial-transformation.jrc.ec.europa.eu/sites/default/files/2019-11/IS_Adopted_03_2012.pdf

Steel sector, climate and peer projects (T)

ID Title Publisher Date URL
T01 Sustainability Indicators Report 2025 (2024 data) World Steel Association (worldsteel) Nov 2025 (updated Feb 2026) worldsteel.org/wider-sustainability/sustainability-indicators/
T02 Steel industry co-products World Steel Association (worldsteel) Accessed 10 Oct 2026 worldsteel.org/wider-sustainability/steel-industry-co-products/
T04 Carbon intensity of electricity generation (Ember data), Cameroon Our World in Data Accessed Oct 2026 ourworldindata.org/grapher/carbon-intensity-electricity
T05 Electricity production by source (Ember and Energy Institute data), Cameroon Our World in Data Accessed Oct 2026 ourworldindata.org/grapher/electricity-prod-source-stacked
T06 CBAM definitive regime European Commission, DG Taxation and Customs Union Accessed 10 Oct 2026 taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism/cbam-definitive-regime_en
T07 Price of CBAM certificates European Commission, DG Taxation and Customs Union Q3 2026 price published 5 Oct 2026 taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism/price-cbam-certificates_en
T08 Environmental and Social Review Summary 51259, Esteel Loan (EAF steel and rebar works, Malaysia) International Finance Corporation 6 Jan 2026 disclosures.ifc.org/project-detail/ESRS/51259/esteel-loan
T09 Environmental and Social Review Summary 8638, Alexandria National Iron and Steel (flat steel production) International Finance Corporation 5 Feb 2010 (updated 30 Sep 2022) disclosures.ifc.org/project-detail/ESRS/8638/alexandria-national-iron-and-steel-ansdk-flat-steel-production
T10 Rapport d’activités 2025 de l’ARSEL Agence de Régulation du Secteur de l’Électricité (ARSEL) 7 Sep 2026 arsel-cm.org/wp-content/uploads/2026/09/Rapport-ARSEL-2025.pdf

Physical environment and geodata (E)

ID Title Publisher Date URL
E01 Monographie du Nyong et des fleuves côtiers, tome 1 (J.-C. Olivry) ORSTOM (now IRD) Jul 1979 horizon.documentation.ird.fr/exl-doc/pleins_textes/divers11-03/01948.pdf
E02 Weakening of coastlines and coastal erosion in the Gulf of Guinea: the case of the Kribi coastline in Cameroon (Fendoung, Tchindjang and Hubert-Ferrari), Land 11:1557 MDPI 2022 doi.org/10.3390/land11091557
E03 Geomatics-based assessment of coastal vulnerability in Kribi (Perabi et al.), Urban Resilience and Sustainability 3(4) AIMS Press Nov 2025 www.aimspress.com/aimspress-data/urs/2025/4/PDF/urs-03-04-012.pdf
E04 ERA5 hourly reanalysis (precipitation, wind, temperature), accessed through the Open-Meteo historical weather API ECMWF; Open-Meteo Accessed 10 Oct 2026 open-meteo.com/en/docs/historical-weather-api
E05 CAMS global atmospheric composition reanalysis (PM10, PM2.5, NO2, SO2, O3, dust), accessed through the Open-Meteo air quality API Copernicus Atmosphere Monitoring Service; Open-Meteo Accessed 10 Oct 2026 open-meteo.com/en/docs/air-quality-api
E06 Kribi Power Project, Environmental and Social Impact Assessment Addendum (gas reciprocating engines) Scott Wilson for AES SONEL (World Bank disclosure) Oct 2007 documents1.worldbank.org/curated/en/760181468239362187/txt/E18210v120EA0P17332B01PUBLIC11paper.txt
E07 Guide du Port de Kribi Port Autonome de Kribi Aug 2020 Cited by title and date
E08 Climate Change 2021: The Physical Science Basis, Summary for Policymakers Intergovernmental Panel on Climate Change 2021 www.ipcc.ch/report/ar6/wg1/downloads/report/IPCC_AR6_WGI_SPM.pdf
E09 World Weather Information Service: Kribi, climatological information (rainfall 1981 to 2010; data from the Direction de la Météorologie Nationale) World Meteorological Organization Accessed 10 Oct 2026 worldweather.wmo.int/en/city.html?cityId=1517
E11 OpenStreetMap data, Overpass API extract for the Kribi area (coastline, watercourses, roads, settlements, landuse, protected areas) OpenStreetMap contributors (ODbL) Base 24 Jul 2026; queried 10 Oct 2026 www.openstreetmap.org
E12 Natural Earth 1:50m cultural vectors, admin-0 countries Natural Earth Version 5 www.naturalearthdata.com
E13 As a megaport rises in Cameroon, a delicate coastal ecosystem ebbs (E. Toto) Mongabay (secondary source) 5 Apr 2024 news.mongabay.com/2024/04/as-a-megaport-rises-in-cameroon-a-delicate-coastal-ecosystem-ebbs/
E15 Environmental and Social Review Summary 25978, Kribi (gas-fired power plant) International Finance Corporation 2010 disclosures.ifc.org/project-detail/ESRS/25978/kribi
E16 Kribi Power Development Corporation, Environmental and Social Review Summary Multilateral Investment Guarantee Agency 2014 www.miga.org/project/kribi-power-development-corporation
E17 SRTM 30 m digital surface model, accessed through the OpenTopoData API NASA; OpenTopoData Accessed 10 Oct 2026 www.opentopodata.org/datasets/srtm/

Biodiversity and protected areas (B)

ID Title Publisher Date URL
B01 Décret n° 2021/4804/PM portant création du Parc National Marin Manyange na Elombo-Campo Prime Minister (FAOLEX copy) 9 Jul 2021 faolex.fao.org/docs/pdf/cmr220623.pdf
B02 Décret n° 2000/004/PM portant création du Parc National de Campo-Ma’an Prime Minister (FAOLEX copy) 6 Jan 2000 faolex.fao.org/docs/pdf/cmr26727.pdf
B03 Décret portant mutation de la Réserve de Faune de Douala-Edéa en Parc National Services du Premier Ministre 2018 www.spm.gov.cm/site/sites/default/files/mutation%20de%20la%20reserve%20de%20la%20faune.pdf
B04 Le paysage culturel des chutes de la Lobé (Tentative List, ref. 6330) UNESCO World Heritage Centre 2018 whc.unesco.org/fr/listesindicatives/6330/
B05 Unchecked development threatens Cameroon’s Manyange Na Elombo-Campo marine park (L. Bongben) Global Voices (secondary source) 22 Nov 2025 globalvoices.org/2025/11/22/unchecked-development-threatens-cameroons-manyange-na-elombo-campo-marine-park/
B06 Beach patrols for marine turtle nesting stock estimation in the Atlantic coastline of Ebodje, Cameroon (A. H. Nibam) Rufford Foundation 2018 www.rufford.org/projects/abi-henry-nibam/beach-patrols-for-marine-turtle-nesting-stock-estimation-in-the-atlantic-coastline-of-ebodje-cameroon/
B07 Protecting biodiversity: the Port Authority of Kribi supports turtle conservation in Ebodje Port Autonome de Kribi 16 Mar 2023 Cited by title and date
B08 Campo Ma’an National Park, Tropical Important Plant Areas factsheet CMNTIPA025 (B. Murphy and J. M. Onana) Royal Botanic Gardens, Kew Accessed 10 Oct 2026 tipas.kew.org/site/campo-maan-national-park/
B09 The IUCN Red List of Threatened Species International Union for Conservation of Nature Accessed Oct 2026 www.iucnredlist.org
B10 IUCN Red List assessments (version 2026-1): Gobush et al. 2021, Loxodonta cyclotis, e.T181007989A204404464; Maisels et al. 2018, Gorilla gorilla gorilla, e.T9406A136251508; Maisels et al. 2016, Pan troglodytes troglodytes, e.T15936A102332276; Pietersen et al. 2019, Phataginus tricuspis, e.T12767A123586469; Nixon et al. 2019, Smutsia gigantea, e.T12762A123584478; BirdLife International 2018, Psittacus erithacus, e.T22724813A129879439; Keith Diagne 2015, Trichechus senegalensis, e.T22104A97168578; Wallace et al. 2013, Dermochelys coriacea, e.T6494A43526147; Abreu-Grobois and Plotkin 2008, Lepidochelys olivacea, e.T11534A3292503; Mortimer and Donnelly 2008, Eretmochelys imbricata, e.T8005A12881238; Wallace and Broderick 2025, Chelonia mydas, e.T4615A285108125 International Union for Conservation of Nature 2008 to 2025; accessed 10 Oct 2026 www.iucnredlist.org
B11 Parc national de Campo Ma’an (Tentative List, ref. 6312) UNESCO World Heritage Centre 2 Feb 2018 whc.unesco.org/en/tentativelists/6312/
B12 Arctic seals threatened by climate change, birds decline globally: IUCN Red List (press release; green turtle moved from Endangered to Least Concern) International Union for Conservation of Nature 10 Oct 2025 iucn.org/press-release/202510/arctic-seals-threatened-climate-change-birds-decline-globally-iucn-red-list

Social, health and cultural heritage (H)

ID Title Publisher Date URL
H01 Enquête Démographique et de Santé du Cameroun 2018 (EDSC-V), final report FR360 Institut National de la Statistique and ICF (DHS Program) 2020 dhsprogram.com/pubs/pdf/FR360/FR360.pdf
H02 Répertoire actualisé des villages du Cameroun, 3e Recensement général de la population et de l’habitat (2005), volume IV, tome 07 (arrondissements of Kribi I and Kribi II) Bureau Central des Recensements et des Études de Population (BUCREP); copy published by the Institut National de la Statistique Census of 2005 (report n.d.) ins-cameroun.cm/wp-content/uploads/2025/06/Repertoire_actualise_villages_cameroun1-3.pdf
H03 Le port de Kribi: force ou menace pour la proposition d’inscription des chutes de la Lobé sur la liste du patrimoine mondial (academic thesis) Memoire Online 2021 www.memoireonline.com/12/21/12599/m_Le-port-de-Kribi-Force-ou-menace-pour-la-proposition-dinscription-des-chutes-de-la-lobe-sur20.html
H05 Bagyeli/Bakola documentation project: geography DoBeS programme (Documentation of Endangered Languages), Max Planck Institute for Psycholinguistics Accessed 11 Oct 2026 dobes.mpi.nl/?p=984
H06 Pipelines, parks, and people: Bagyeli document land use near Campo Ma’an National Park (J. Nelson and B. Tchoumba), Cultural Survival Quarterly 28-1 Cultural Survival 2004 (web edition 7 May 2010) www.culturalsurvival.org/publications/cultural-survival-quarterly/pipelines-parks-and-people-bagyeli-document-land-usenear
H08 Cameroon inaugurates controversial dam despite local dissent (Y. Kenné) Mongabay (secondary source) 10 Oct 2025 news.mongabay.com/2025/10/cameroon-inaugurates-controversial-dam-despite-local-dissent/
H09 Cameroon: Lobé-Kribi iron ore project poses social and environmental challenges, warns NGO (title shortened) Business and Human Rights Resource Centre Feb and Dec 2025 www.business-humanrights.org/en/latest-news/cameroon-lob%C3%A9-kribi-iron-ore-project-led-by-chinas-state-owned-sinosteel-poses-social-and-environmental-challenges-warns-ngo/
H10 Cameroun: bouclage du 4e RGPH, 22,7 millions d’habitants recensés (provisional field count) Journal du Cameroun 5 Oct 2026 fr.journalducameroun.com/cameroun-bouclage-du-4e-rgph-227-millions-dhabitants-recenses-en-mode-digital/
H11 The Indigenous World 2026, 40th edition (general editor D. Mamo), chapter "Cameroon" (H. Hamman Bouba), pp. 43 to 50; the figures cited are on p. 44; ISBN 978-87-93961-87-6 International Work Group for Indigenous Affairs (IWGIA), Copenhagen Apr 2026 (accessed 11 Oct 2026) www.iwgia.org/images/publications/indigenous-world/indigenous-world-2026.pdf
H12 A grammar of Gyeli (N. Grimm), Comprehensive Grammar Library 2, publisher’s synopsis Language Science Press, Berlin (open access, peer-reviewed) 2021 (accessed 11 Oct 2026) langsci-press.org/catalog/book/298

Kribi port, industrial zone and infrastructure (K)

ID Title Publisher Date URL
K02 Zone industrialo-portuaire de Kribi (KPIZ): jusqu’à +8 points de croissance et 150 000 emplois attendus sur 15 ans Investir au Cameroun 4 Mar 2026 www.investiraucameroun.com/gestion-publique/0403-23163-zone-industrialo-portuaire-de-kribi-kpiz-jusqu-a-8-points-de-croissance-et-150-000-emplois-attendus-sur-15-ans
K03 Cameroon launches $860m Kribi industrial zone to process raw materials locally; PAK, AGL, Arise IIP and Belmont launch €795m Kribi Port Industrial Zone Ecofin Agency; Business in Cameroon 27 Feb 2026 www.ecofinagency.com/news/2702-53326-cameroon-launches-860m-kribi-industrial-zone-to-process-raw-materials-locally; www.businessincameroon.com/public-management/2202-15797-pak-agl-arise-iip-and-belmont-launch-795m-kribi-port-industrial-zone
K04 Cameroon: African Development Bank Group supports development of integrated industrial zone at the Port of Kribi African Development Bank (via AllAfrica) 2 Mar 2026 allafrica.com/stories/202603100682.html
K05 Le PAK tient enfin son titre foncier (presidential decree of 23 June 2023 on the port domain) Port Autonome de Kribi 26 Jun 2023 Cited by title and date
K06 Présentation du Port Autonome de Kribi (brochure) Port Autonome de Kribi Oct 2018 Cited by title and date
K07 Cameroon’s Kribi port triples capacity with launch of second container terminal Business in Cameroon May 2025 www.businessincameroon.com/infrastructures/1205-14650-cameroon-s-kribi-port-triples-capacity-with-launch-of-second-container-terminal
K08 Port de Kribi: la performance au service de la Nation (op-ed by the Director General of the port) Port Autonome de Kribi 21 Apr 2026 Cited by title and date
K09 Bilan et perspectives: les voyants sont au vert Port Autonome de Kribi 13 Mar 2025 Cited by title and date
K10 La zone industrialo-portuaire de Kribi rayonne avec l’inauguration de la cimenterie CIMPOR Port Autonome de Kribi 19 Jul 2024 Cited by title and date
K12 Énergie et infrastructures: un nouvel élan pour la compétitivité du Port de Kribi Port Autonome de Kribi 19 Aug 2026 Cited by title and date
K13 Le port de Kribi engage 3,5 milliards FCFA pour préparer l’arrivée de nouveaux industriels Ecomatin 11 May 2026 ecomatin.net/cameroun-le-port-de-kribi-engage-35-milliards-fcfa-pour-preparer-larrivee-de-nouveaux-industriels
K19 Kribi Deep Sea Port, investors partner to construct 125-million-tonne mineral terminal worth $2 billion Business in Cameroon 5 Nov 2025 www.businessincameroon.com/transport/0511-15300-kribi-deep-sea-port-investors-partner-to-construct-125-million-tonne-mineral-terminal-worth-2-billion
K20 Ligne ferroviaire Édéa, Kribi, Lolabé, Campo: une nouvelle étape pour la connectivité du Port de Kribi Port Autonome de Kribi 4 Jun 2026 Cited by title and date
K21 Chemin de fer Mbalam-Kribi et terminal minéralier: un tournant pour l’intégration régionale Port Autonome de Kribi 25 Feb 2022 Cited by title and date
K24 Visites des projets et autorisations d’occupation temporaire: le PAK au cœur du développement industriel (acronym in the original title expanded) Port Autonome de Kribi 28 Aug 2025 Cited by title and date
K25 Avis à manifestation d’intérêt n° 013/AMI/PAK/2026 (statistics on requests for space and authorisations granted) Agence de Régulation des Marchés Publics (ARMP) 30 Jan 2026 www.armp.cm/details?type_publication=AMI&;id_publication=6073

Project public record and planning basis (X)

ID Title Publisher Date URL
X01 Kribi: le Premier ministre, chef du gouvernement est là (foundation stone of the Kribi steel complex) Cameroon Tribune 30 Dec 2024 cameroon-tribune.cm/article.html/68499/fr.html/details_2
X02 Industrialisation: la voie royale de l’émergence (1 Mtpa capacity) Cameroon Tribune 2 Jan 2025 cameroon-tribune.cm/article.html/68558/fr.html/details_2
X03 Cameroon Steel reference configuration RC-1 (planning estimate): planned capacities, phases, indicative schedule and benchmark-based estimates, edition of 10 October 2026 Cameroon Steel 10 Oct 2026 Not published separately; the planned and indicative figures used are reproduced in this paper (Annex A) and in the data files of its web edition

Cite this chapter

Cameroon Steel (2026). Building responsibly in Kribi: a steelworks can meet international standards on four conditions. White paper 07, annex C: Sources. CS-WP-07. https://www.cameroon-steel.com/en/library/responsible-kribi/annex-sources/