From mineral resource to industrial value

White paper 05 · Annex A

Method, assumptions and calculations

This annex sets out how the figures in this paper were produced: the evidence statuses, the conventions and conversion factors, the assumptions with their ranges, and the arithmetic behind every derived number. The data behind each chart are tabulated in Annex D and published with the web edition as data files, and the charts are generated by a script from the same values, so that text, tables and charts cannot drift apart.

Reading
12 min
Length
2,708 words
Edition of
10 October 2026
In this chapter (6)
  1. A.1 Evidence statuses
  2. A.2 Conventions and conversion factors
  3. A.3 Assumptions and ranges
  4. A.4 Derivations
  5. A.5 Maps
  6. A.6 Quality checks

A.1 Evidence statuses

Every figure in this paper carries one of four statuses, shown as a chip on each exhibit:

  • Sourced: read from a published source listed in Annex C.
  • Derived: Cameroon Steel’s arithmetic on sourced or planned inputs, shown in this annex.
  • Assumed: a stated planning assumption, with a range.
  • Illustrative: a scenario or a picture of how something works, not a forecast.

Three further words qualify RC-1 values only, never a sourced figure: planned (a value of the reference configuration), indicative (a later phase or a value still to be engineered) and target (a schedule date).

Project figures come from the Cameroon Steel reference configuration RC-1 (planning estimate), edition of 10 October 2026, as revised on that date (RC-1.1) [S07]. They are planned or indicative values derived from published benchmarks and will be replaced by supplier guarantees at front-end engineering. They are not commitments.

A.2 Conventions and conversion factors

  • Currency. The CFA franc (FCFA, XAF) is pegged to the euro at 655.957 FCFA per euro. The US dollar rate floats; this paper uses a planning rate of 600 FCFA per US dollar (range 560 to 650) [S07], except where a source states its own rate. SNH’s 2025 accounts use quarterly rates from 624.9 to 561.0 FCFA per US dollar [S05].
  • Gas volumes and energy. 1 Mscf (thousand standard cubic feet) is taken as 1.037 MMBtu, or about 1.094 GJ on a higher-heating-value basis; 1 bcf is therefore about 1.094 PJ. 1 m3 is 35.315 standard cubic feet, so 1 Mscf is 28.317 m3. With these factors, 9.2 to 10 PJ is 8.4 to 9.1 bcf [S39][S41].
  • Electricity. 1 MWh is 3.6 GJ of final energy. worldsteel counts each MWh as about 9.8 GJ of primary energy [S35].
  • Tonnes. Finished products are bars, wire rod and sections; liquid steel is steel tapped from the furnace; the metallic charge is scrap plus DRI or HBI. Nameplate output is the design capacity; expected sustained output is the planning range for a mature year (270,000 to 300,000 t in Phase 1).
  • Operating hours. Average loads are annual energy divided by 8,000 operating hours a year, as in RC-1 [S07].

A.3 Assumptions and ranges

Table A.1 Assumptions used in this paper, with ranges and status

Parameter Value Range Status Basis
FCFA per US$ (planning rate) 600 560 to 650 assumed RC-1 [S07]
EAF electricity, planning value 450 kWh/t liquid 347 to 500 sourced IFC 2007 [S36]
EAF electricity, upper planning value with 30% DRI or HBI About 490 kWh/t liquid (493.5) not applicable derived 450 + 3 x 14.5 [S39]
Furnace transformer, Phase 1 30 to 33 MVA class about 30 MW of active power with short-term overload assumed RC-1 [S07]
Ladle furnace, caster and auxiliaries 70 kWh/t liquid 50 to 100 assumed RC-1 [S07]
Induction billet heating (Phase 1) 300 kWh/t billet 150 to 400 assumed RC-1 [S07]
Rolling 110 kWh/t product 70 to 140 sourced IFC 2007 [S36]
Gas-fired reheating (Phases 2 and 3) 1.3 GJ/t product 1.1 to 1.6 assumed RC-1 [S07]; EU BAT range [S40]
Gas for DRI 9.2 to 10 GJ/t DRI RC-1 planning 10 (9.2 to 10) sourced / assumed [S39][S41][S07]
DRI or HBI share of the metallic charge 30% 20% to 50% assumed RC-1 [S07]
EAF penalty for DRI 14.5 kWh/t per 10% DRI not given sourced Energiron [S39]
Metallic yield 0.88 t liquid per t metallics 0.85 to 0.91 assumed RC-1 [S07]
Casting and rolling yield 0.94 t product per t liquid 0.92 to 0.96 assumed RC-1 [S07]
Grid emission factor 226 g CO₂e/kWh 200 to 300 sourced Ember via OWID, 2024 [S10]
Natural gas emission factor 0.0561 t CO₂/GJ not applicable sourced IPCC 2006 default [S07]
Oil-fired generation emission factor 0.75 t CO₂/MWh 0.70 to 0.80 assumed Paper assumption for light and heavy fuel oil plants
Maximum demand, Phase 1 55 MVA 45 to 65 assumed RC-1 [S07]
Maximum demand, full build-out 160 MVA 130 to 190 assumed RC-1 [S07]
Power factor for maximum demand 0.95 0.90 to 0.98 assumed Paper assumption (compensated plant)
Furnace short-circuit power SscF About twice the rating of a transformer of the 30 to 33 MVA class 1.5 to 2.5 x the rating assumed Paper screening assumption
Flicker factor Kst 48 to 85 not applicable sourced UIE, as cited in [S12]
SVC flicker reduction factor 0.5 not given sourced [S12]
Port 30 kV transformer impedance 12% to 18% not applicable assumed Typical values for 60 MVA units
PV performance ratio (daily profile) 0.80 0.75 to 0.85 assumed Paper assumption
Rebar export reference price US$625/t US$620 to 630 sourced AISU, 3 October 2026 [S09]

Source: as listed.

A.4 Derivations

RC-1 balances. Liquid steel equals finished products divided by the casting and rolling yield (0.94); the metallic charge equals liquid steel divided by the metallic yield (0.88); the DRI or HBI quantity equals the metallic charge times 30%. Electricity equals liquid steel times (450 + 70) kWh/t, plus 300 kWh/t on the 300,000 t of the Phase 1 mills, plus 110 kWh/t on all finished products. For Phase 1 this gives 319,149 t of liquid steel and 288,957 MWh; for the full works 1,063,830 t and 753,191 MWh [S07]. At the upper planning value the furnace uses 40 kWh more per tonne of liquid steel: 301,723 MWh in Phase 1, 442,872 MWh for Phases 1 and 2 and 795,745 MWh at full build-out, or 37.7, 55.4 and 99.5 MW on 8,000 hours (derived). Reheating gas is 1.3 GJ/t on the products of Phases 2 and 3: 260,000 GJ for 200,000 t and 910,000 GJ for 700,000 t.

Electricity cost per tonne (Table 1.2). Cost per tonne equals the electricity intensity (0.963 MWh/t in Phase 1; 0.753 MWh/t at full build-out) times the price in FCFA/kWh times 1,000, converted at 600 FCFA per US dollar. For example, 0.963 x 43.7 x 1,000 = 42,091 FCFA/t, or US$70.2/t. At the upper planning value, 1.006 MWh/t, every cost is 4.4% higher.

Medium-voltage all-in price (Figures 3.1 and 3.2). All-in price = (monthly fixed charge per kW / hours of use at subscribed power + energy charge) x 1.1 cubed, where 1.1 cubed (1.331) applies the three annual increases of 10% for the 3 to 10 MW bands in 2024, 2025 and 2026 [S03]. At 650 hours a month in the 9 to 10 MW band: (15,500 / 650 + 9) x 1.331 = 43.7 FCFA/kWh. For RC-1 Phase 1: 288,957 MWh / (55 MVA x 0.95) = 5,530 hours a year, or 461 hours a month, giving 56.7 FCFA/kWh. At 301,723 MWh: 5,775 hours a year, or 481 a month, giving 54.8 FCFA/kWh, 28% above the flat-load 42.9.

Legacy high-voltage price. 17.80 bn FCFA / 969.03 GWh = 18.4 FCFA/kWh [S01].

Transmission charge. For a 100 MW load at an 80% load factor (700,800 MWh a year): (16.18 m FCFA x 100 + 0.41 FCFA x 700.8 m kWh + 4.48 m FCFA) / 700.8 m kWh = 2.7 FCFA/kWh [S53].

Kribi gas plant. Capacity factor = 559.67 GWh / (216 MW x 8,760 h) = 29.6%. Gas use = 4.92 bcf / 559.67 GWh = 8.79 Mscf per MWh, or about 9.6 GJ per MWh, an electrical efficiency of about 37%. At 80% capacity factor: 216 x 0.8 x 8,760 = 1,514 GWh, needing 13.3 bcf; at 330 MW, 20.3 bcf. Fuel cost per kWh at US$3.2/Mscf: 8.79 x 3.2 / 1,000 = US$0.028, or about 17 FCFA; at US$5.6/Mscf, about 30 FCFA. Emissions: 9.6 GJ/MWh x 0.0561 = 0.54 t CO₂/MWh [S05][S01].

Combustion-only grid intensity, 2025 (Chapter 8). About 74 g/kWh, an estimate taken from White paper 06 (Chapter 3 and Annex A), so that the series prints one value with one derivation. The emission rate of gas and oil generation implied by the 2024 data, about 771 g/kWh, is applied to the gas and oil generation that the regulator reports for 2025 (559.7 + 153.9 + 66.7 = 780.3 GWh) [S01], which gives about 602 kt of CO₂; divided by total generation of 8,119.9 GWh, this is about 74 g/kWh. Hydro and solar are counted at zero on this basis. The difference from the life-cycle average of 226 g/kWh for 2024 [S10] reflects both the basis (combustion versus life cycle) and the year and data source (Chapter 2).

Gas for direct reduction (Figure 7.1). Gas in bcf = module capacity in Mt x GJ per tonne / 1.094. For 1 Mt: 9.2 / 1.094 = 8.4 bcf; 10 / 1.094 = 9.1 bcf; 23 to 25 MMscf a day over 365 days. Over twenty years: 168 to 183 bcf. Gas cost per tonne of DRI = gas price x GJ per tonne / 1.094; at US$5.6/Mscf: 47 to 51 US$/t.

Gas balance (Figure 6.1). Candidate domestic uses: the Kribi plant at its 2025 dispatch (4.92 bcf), at an 80% capacity factor (13.3 bcf) and extended to 330 MW (20.3 bcf); the industrial buyer at twice its half-year purchase (6.2 bcf); RC-1 reheating at full build-out (910,000 GJ / 1.094 = 0.83 bcf); a 1 Mtpa DRI module (8.4 to 9.1 bcf). Without DRI: 13.3 + 6.2 + 0.8 = 20.3 bcf. With the plant at 330 MW and DRI: 20.3 + 6.2 + 0.8 + 9.1 = 36.5 bcf.

FLNG cumulative feed (Chapter 6). Operation from June 2018 to July 2026 is about eight years [S88][S16]. At 60 to 72 bcf a year, the cumulative feed would be about 490 to 580 bcf, the same order as the 500 bcf allocation [S84]. This is an approximation to be replaced by SNH’s production records.

Special petroleum tax. 70 FCFA/m3 x 28.317 m3/Mscf = 1,982 FCFA/Mscf, or US$3.2 at 625 FCFA per US dollar and US$3.5 at 561 [S87][S05].

Flicker screening (Figure 4.3). Pst99 = Kst x SscF / SscPCC is a simplified screening relation used by this paper, not a calculation from a standard; the Kst range of 48 to 85 is the UIE’s, as cited in [S12]. SscF is taken at about twice the rating of a transformer of the 30 to 33 MVA class. The short-circuit power needed at the PCC is SscF multiplied by Kst and divided by the planning level of 0.8: about 4,000 MVA at Kst 48 and about 7,000 MVA at Kst 85. With an SVC halving flicker [S12]: about 2,000 to 3,500 MVA. Results are given to one significant figure; Figure 4.3 and its table in Annex D are drawn from these rounded results. Several equal furnaces combine by a cubic law [S13]: two furnaces give 2 to the power one-third, about 1.3, times the flicker of one.

30 kV fault level. A transformer’s contribution to a fault on its secondary side is approximately its rating divided by its per-unit impedance. Three 60 MVA transformers at 12% give 3 x 60 / 0.12 = 1,500 MVA; at 18%, 1,000 MVA. A finite 225 kV source lowers these values further.

Solar (Chapter 8). PVGIS v5.3 PVcalc for 2.94 N, 9.91 E, crystalline silicon, 1 kWp, 14% system losses, optimal slope (6 degrees), radiation database PVGIS-SARAH3 for 2005 to 2023: 1,334.7 kWh per kWp a year [S19]. Capacity factor = 1,334.7 / 8,760 = 15.2%. A 50 MWp array: 50 x 1,334.7 = 66.7 GWh a year, 23% of Phase 1’s 289 GWh and 22% of 302 GWh. Daily profiles use PVGIS DRcalc average irradiance by hour for January and July, shifted from UTC to West Africa Time, times 50 MW per 1,000 W/m2 times a performance ratio of 0.80.

Scope 2 and the near-zero threshold. Scope 2 per tonne = 0.963 MWh/t x grid factor. The IEA near-zero threshold is 0.40 - 0.35 x scrap share t CO₂e per tonne [S20]; at a 70% scrap share (253,868 t of scrap in 362,669 t of metallics in Phase 1 [S07]) it is 0.155 t.

Illustrative load profiles (Figures 4.1 and 9.2). Each heat follows a fixed sequence: bore-in (4 minutes, 20 MW mean), melting (16 minutes, 27 MW), recharge (3 minutes, off), bore-in (4 minutes, 20 MW), melting (12 minutes, 27 MW), refining (8 minutes, 24 MW) and tapping and turnaround (13 minutes, off), with random variation of 35% during bore-in, 14% during melting and 4% during refining (fixed random seed), and active power capped at 30 MW, about what a transformer of the 30 to 33 MVA class delivers with short-term overload. The mean energy per heat is about 18 MWh, or about 450 kWh per tonne on a heat of about 40 t, consistent with the RC-1 planning value. Steady loads are 11.25 MW for induction heating (300 kWh/t x 37.5 t/h), 4.13 MW for rolling (110 kWh/t x 37.5 t/h) and 1.3 MW of auxiliaries, plus a 4.5 MW ladle-furnace pulse for 20 minutes an hour. The profiles show the character of the load and are not forecasts.

Upper planning value for the furnace (Chapter 1). 450 kWh/t, read as an all-scrap value, plus 14.5 kWh/t for each 10 percentage points of DRI or HBI in the charge [S39]: 450 + 3 x 14.5 = 493.5 kWh/t at RC-1’s 30%, used as the upper planning value of about 490 kWh/t (as in White paper 03); 522.5 kWh/t at 50%.

Schedulable load and the cost of curtailment (Chapter 9). About 8,000 heats of about 40 t at nameplate need about 7,300 to 7,900 furnace hours at about 55 to 59 minutes tap to tap (450 to 490 kWh/t), out of the 8,760 hours in a year (White paper 03, Chapter 5 and Annex A). At the 7,000 to 7,700 operating hours that give the expected sustained output, the furnace is not scheduled to operate for the remaining 1,060 to 1,760 of the year’s 8,760 hours, about three to five hours a day. Beyond those hours, one hour of curtailment costs about one heat (about 40 t): 100 hours cost about 4,000 t of liquid steel, about 1.25% of 319,149 t. Moving 20 to 30 MW out of the peak equals 1.6% to 2.3% of the 2025 peak of 1,278 MW [S01].

Phase 1 metallics and port inbound (Chapter 7). Domestic scrap is planned at 30,000 t a year (0 to 60,000 t), bounded by the only quantified national study of scrap arising, 53,000 to 61,833 t a year in 2006 [S98]; the rest of the 253,868 t of scrap and the 108,801 t of DRI or HBI are imported, which with about 6% of consumables gives about 351,000 t a year of port inbound cargo at nameplate [S07].

Phase 1 electricity range (Chapter 9). Low case: 319,149 t x (347 + 50) kWh/t + 300,000 t x (150 + 70) kWh/t = 192.7 GWh. High case: 319,149 t x (500 + 100) + 300,000 t x (400 + 140) = 353.5 GWh.

A.5 Maps

The maps were drawn by Cameroon Steel from OpenStreetMap data (© OpenStreetMap contributors, Open Database Licence), extracted through the Overpass API on 24 July 2026 (coast, roads, land use around Kribi) and 10 October 2026 (power lines, substations and plants in southern Cameroon) [S60], and from Natural Earth country boundaries. OpenStreetMap is a volunteer dataset: it is not a complete or authoritative record of the network, and the 400 kV Nachtigal line, for example, was not mapped at the time of extraction. The route of the new 225 kV line from the Kribi gas plant to the port is drawn schematically between its published end points, and the port substation’s position is indicative. No site boundaries are shown.

A.6 Quality checks

Before publication, the text was checked for consistency between every figure quoted in the prose, the tables and the chart data; for the units, years and sources of every number; and for the absence of confidential or commercially sensitive information. Generated images are labelled "Illustrative view" and are not photographs of any project.

Sources cited in this chapter

Bracketed markers refer to these sources; the full list is in the annex. Full list of sources

  1. S07Cameroon Steel reference configuration RC-1 (planning estimate), edition 10 October 2026 (RC-1.1): phases, benchmarks with ranges, indicative balances and schedule. Cameroon Steel, 10 Oct 2026.Cited by title and date
  2. S05Données pétrolières 2025. SNH, posted Jun 2026.snh.cm/wp-content/uploads/2026/06/Donnees-petrolieres-2025.pdf
  3. S39ENERGIRON technology (DRI-EAF with natural gas or H₂). EC ICIT, ref. 12 Feb 2026.innovation-centre-for-industrial-transformation.ec.europa.eu/innovativ…
  4. S41Suez Steel sets new benchmark in energy consumption for DRI production. Danieli, 16 Apr 2026.danieli.com/en/news-media/news/suez-steel-sets-new-benchmark-energy-co…
  5. S35Iron and Steel Technology Roadmap. IEA, Oct 2020.iea.blob.core.windows.net/assets/eb0c8ec1-3665-4959-97d0-187ceca189a8/…
  6. S36Environmental, Health, and Safety Guidelines for Integrated Steel Mills. IFC / World Bank Group, 30 Apr 2007.ifc.org/content/dam/ifc/doc/2000/2007-integrated-steel-mills-ehs-guide…
  7. S40Commission Implementing Decision (EU) 2022/2110, BAT conclusions, ferrous metals processing. European Commission (OJ L 284), 11 Oct 2022.eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:32022D2110
  8. S10Carbon intensity of electricity generation (Ember data). Our World in Data, Dataset accessed Oct 2026.ourworldindata.org/grapher/carbon-intensity-electricity
  9. S12US Patent 10,145,612: Flicker reduction in electric arc furnaces by means of flicker prediction from the state determination in the initial phase of the smelting process. Siemens (assignee now Siemens Energy Global), Granted 4 Dec 2018.patents.google.com/patent/US10145612
  10. S09Weekly steel prices (archive 40468). Arab Iron & Steel Union (AISU), 3 Oct 2026.aisusteel.org/en/archives/40468
  11. S03Tableaux tarifaires, Décision ARSEL N°00000427 (MT 2023-2025). ARSEL, uploaded Jan 2026.arsel-cm.org/wp-content/uploads/2026/01/TABLEAUX-TARIFAIRES-decision-M…
  12. S01Rapport d’activités 2025 de l’ARSEL. ARSEL (electricity regulator), 7 Sep 2026.arsel-cm.org/wp-content/uploads/2026/09/Rapport-ARSEL-2025.pdf
  13. S53Tarif transport et GRT (Décision 0000017D). ARSEL, 17 Jan 2025.arsel-cm.org/wp-content/uploads/2026/01/TARIF-TRANSPORT-ET-GRT-1.pdf
  14. S88Cameroon FLNG Terminal. Global Energy Monitor (GEM.wiki; tertiary), last edit 10 Oct 2026.gem.wiki/Cameroon_FLNG_Terminal
  15. S16Le navire usine quitte le Cameroun, le gaz s’arrête. Camer.be, 9 Jul 2026.camer.be/93911/12:1/le-navire-usine-quitte-le-cameroun-le-gaz-sarrete-…
  16. S84Golar signs Heads of Agreement for the development of a Floating Liquefaction export project in Cameroon (news release, filed with the US Securities and Exchange Commission on Form 6-K). Golar LNG Ltd, 24 Dec 2014.sec.gov/Archives/edgar/data/0001207179/000117184314006037/newsrelease.…
  17. S87Industrial gas: Cameroon suspends GDC’s 20% price hiking plan. Business in Cameroon, 18 Jul 2023.businessincameroon.com/energy/1807-13291-industrial-gas-cameroon-suspe…
  18. S13IEC TR 61000-3-7:2008, Electromagnetic compatibility, Part 3-7: Assessment of emission limits for the connection of fluctuating installations to MV, HV and EHV power systems (Ed. 2.0); indicative planning levels for flicker: Table 2 (section 4.2.1). International Electrotechnical Commission (table title read in the preview on the VDE Verlag site; values checked against secondary reproductions), 2008.vde-verlag.de/iec-normen/preview-pdf/info_iectr61000-3-7{ed2.0}en.pdf
  19. S19PVGIS v5.3 web services (PVcalc, DRcalc), Kribi 2.94 N 9.91 E, PVGIS-SARAH3 2005 to 2023. European Commission, Joint Research Centre.re.jrc.ec.europa.eu/api/v5_3/
  20. S20Achieving Net Zero Heavy Industry Sectors in G7 Members. IEA, 19 May 2022.iea.blob.core.windows.net/assets/c4d96342-f626-4aea-8dac-df1d1e567135/…
  21. S98Bidoung J., Fomethe A., Yantio G., Melo U., La récupération et le recyclage des déchets ferromagnétiques: analyse de la situation au Cameroun (Déchets, Revue francophone d’écologie industrielle n°48). ENSP Yaoundé / MIPROMALO, Q4 2007.eid.episciences.org/7942/pdf
  22. S60OpenStreetMap power features (lines, substations, plants), southern Cameroon, via the Overpass API; Kribi base extract (coast, roads, land use). OpenStreetMap contributors (ODbL), Extracts 24 Jul and 10 Oct 2026.openstreetmap.org

Cite this chapter

Cameroon Steel (2026). Cameroon’s hydro grid can power low-carbon steel if large users get firm supply, clear tariffs and gas. White paper 05, annex A: Method, assumptions and calculations. CS-WP-05. https://www.cameroon-steel.com/en/library/energy-for-industry/annex-method/