From mineral resource to industrial value

White paper 03 · Annex D

Data tables

This annex lists the values plotted in every chart of the paper, so that readers can check them, reuse them and reproduce the figures. Each table gives units, the status of the values (sourced, derived, assumed or illustrative, as defined in Annex A) and the source identifiers listed in Annex C. The same values are published as machine-readable files with the web edition of this paper. Diagrams that carry no plotted values (Figures 1.1, 2.1, 4.1, 5.1, 6.1, 7.2, 8.1, 8.2 and 10.1) are not repeated here.

Reading
10 min
Length
2,284 words
Edition of
10 October 2026
In this chapter (4)
  1. D.1 Executive summary and Chapters 1 to 3: routes, energy and capital
  2. D.2 Chapters 3 and 4: metallics, ore and gas
  3. D.3 Chapters 5 to 7: melt shop, rolling and product quality
  4. D.4 Chapter 9: the phased pathway

D.1 Executive summary and Chapters 1 to 3: routes, energy and capital

Table D.1 Data behind Figure ES.1: CO2 intensity and indicative capex by route

Route CO2, t per t crude steel Capex low, US$/t capacity Capex high, US$/t capacity Status
Blast furnace + basic oxygen furnace (BF-BOF) 2.34 500 900 CO2 sourced; capex derived
Gas direct reduction + EAF (DRI-EAF) 1.47 510 1,310 CO2 sourced; capex derived
Scrap + EAF 0.69 330 560 CO2 sourced; capex derived
World average 1.92 Sourced
Kribi pathway (RC-1): Phase 1, scope 1+2, t CO2 per t finished product 0.32 Not shown Not shown Derived (estimated)
Kribi pathway (RC-1): Phase 1, with imported DRI, t CO2 per t finished product 0.58 Not shown Not shown Derived (estimated)
Kribi pathway (RC-1): 1 Mtpa, 70% domestic DRI, t CO2 per t finished product 0.83 Not shown Not shown Derived (estimated)

Source: worldsteel 2024 data [S01]; capex derived from IEA annualised costs, about 2019 US dollars, not escalated [S02]; method D1 in Annex A. Pathway values: Cameroon Steel reference configuration RC-1 (planning estimate) [S03], per tonne of finished product on Cameroon’s grid, a different boundary from the route averages; methods D6 and D16 (the last value, 0.83, is shown as about 0.8). No capex is given for the project.

Table D.2 Data behind Figure 1.2: iron content of iron oxides

Phase Formula Iron,% by mass Status
Hematite Fe2O3 69.9 Derived (stoichiometry)
Magnetite Fe3O4 72.4 Derived (stoichiometry)
Wüstite FeO 77.7 Derived (stoichiometry)
Metallic iron Fe 100.0 Definition

Source: Cameroon Steel, from atomic masses Fe 55.845 and O 15.999.

Table D.3 Data behind Figure 1.3: steel production by process and projects under construction

Series Process Share,% Status
World crude steel, 2025 Basic oxygen 69.4 Sourced
World crude steel, 2025 Electric 30.3 Sourced
World crude steel, 2025 Other 0.3 Sourced
Africa crude steel, 2025 Basic oxygen 11.0 Sourced
Africa crude steel, 2025 Electric 89.0 Sourced
Projects under construction worldwide, 2026 (count) Electric arc 71.0 Sourced
Projects under construction worldwide, 2026 (count) Other routes 29.0 Sourced

Source: worldsteel, World Steel in Figures 2026 [S41]; Global Energy Monitor, Pedal to the Metal 2026 [S45].

Table D.4 Data behind Figure 2.2: CO2 and energy intensity by route

Route CO2, worldsteel 2024, t/t CO2, IEA direct + indirect, t/t Energy, worldsteel 2024, GJ/t Final energy, IEA, GJ/t
BF-BOF 2.34 2.2 23.88 21.4
Gas DRI-EAF 1.47 1.4 23.30 17.1
Scrap-EAF 0.69 0.3 9.84 2.1

Source: worldsteel Sustainability Indicators 2025 [S01]; IEA Iron and Steel Technology Roadmap [S02]. Status: sourced. worldsteel counts electricity as primary energy and includes upstream emissions; the IEA uses final energy and a 538 g CO2/kWh grid.

Table D.5 Data behind Figure 2.3: capex ranges and project benchmarks, US$ per tonne of annual capacity

Route or project Value Basis Status and source
Scrap-EAF (IEA-derived) 330 to 560 Range Derived [S02]
BF-BOF (IEA-derived) 500 to 900 Range Derived [S02]
Gas DRI-EAF (IEA-derived) 510 to 1,310 Range Derived [S02]
CMC Arizona 2 micro-mill (US, 2020) 660 Announced budget ÷ announced capacity Derived [S58]
Nucor Lexington rebar micro-mill (US, 2022) 900 Announced budget ÷ announced capacity Derived [S57]
CMC Berkeley County micro-mill (US, 2022) 990 Announced budget ÷ announced capacity Derived [S59]
New integrated BF-BOF (MPP, 2022) 1,200 Announced budget ÷ announced capacity Derived [S56]
Tosyali DRI-EAF complex incl. rolling (Algeria, 2026) 1,560 Announced budget ÷ announced capacity Derived [S60]

Source: As listed. Project values are nominal in the currency year of each announcement; US capacities, announced in short tons, are converted to tonnes (1 short ton = 0.9072 t; method D1). None is a Cameroon Steel estimate.

D.2 Chapters 3 and 4: metallics, ore and gas

Table D.6 Data behind Figure 3.1: Cameroon’s chapter 72 imports and billet imports, thousand tonnes

Year Billets and semis (HS 7207), kt All chapter 72 imports, kt Billet share,% (derived)
2019 52.5 182.9 28.7
2020 89.9 279.0 32.2
2021 110.5 297.6 37.1
2022 151.2 283.6 53.3
2023 161.4 304.1 53.1

Source: UN Comtrade for HS 7207 [S05]; INS Cameroun for chapter 72 [S67, S70, S71]. Status: sourced; shares derived. The two sources use different reporting systems.

Table D.7 Data behind Figure 3.2: iron units by RC-1 phase and domestic scrap, thousand tonnes a year

Case Iron units, kt of which DRI/HBI, kt of which scrap, kt
Phase 1 0.3 Mtpa 362.7 108.8 253.9
Phases 1+2 0.5 Mtpa 604.4 181.3 423.1
Full 1.0 Mtpa 1,209 362.7 846.2
Full, domestic DRI at 70% 1,209 846.2 362.7
Domestic scrap arising, 2006 study 53 to 61.8 Sourced [S13]
Domestic scrap collected today (order of magnitude) 125 Derived (method D5)
Domestic scrap RC-1 assumes for the plant 30 (0 to 60) Assumed [S03]

Source: Cameroon Steel reference configuration RC-1 (planning estimate), indicative balances [S03] (metallic yield 0.88, casting and rolling yield 0.94, DRI 30% of the charge; last case 70%); scrap study [S13]; derivation inputs [S32, S33, S74]. Status: derived.

Table D.8 Data behind Figure 4.2: Mbalam products against DR-grade thresholds

Product or threshold Iron,% Silica + alumina,%
Mbalam DSO reserve (JORC, 2015) 62.2 7.26
Mbalam itabirite BF-grade concentrate (testwork, 2014) 66.6 3.80
Mbalam itabirite DR-grade concentrate (testwork, 2014) 68.0 2.00
worldsteel minimum iron for DR processes 64 Not stated
Typical traded DR grade 67 to 68 Low

Source: JORC reserve, 2015 [S18]; testwork, 2014 [S19]; worldsteel [S16]; IEEFA [S17]. Status: sourced.

Table D.9 Data behind Figure 4.3: indicative mass flow per tonne of DRI

Item Value Unit Basis
Itabirite ore 3.2 t per t DRI Concentrate ÷ 45% mass yield [S19]; derived
DR-grade concentrate 1.45 t per t DRI Equal to pellets, binder ignored; derived
DR pellets 1.45 t per t DRI Implied by BNEF figures cited by IEEFA [S17]; derived
Natural gas 10 GJ per t DRI ENERGIRON reference [S20]
Grind size (testwork) 53 µm, P80 Testwork [S19]
Iron recovery (testwork) 81 % Testwork [S19]
DRI metallisation 92 to 96 % IIMA [S14]

Source: As listed. Status: derived from sourced inputs; method D12 in Annex A.

Table D.10 Data behind Figure 4.4: gas volumes and DRI gas demand, billion cubic feet a year

Item bcf per year % of 2025 national production
National production, 2025 75.47 100
Sold as LNG feed, 2025 71.62 95
Kribi power plant, 2025 4.92 7
Industrial buyer (KEDA), 2025 3.09 4
DRI module 0.5 Mtpa 4.57 6
DRI module 1.0 Mtpa 9.14 12

Source: SNH, Données pétrolières 2025 [S21]; DRI demand at 10 GJ per tonne [S20] and 1.094 GJ per thousand cubic feet. Status: 2025 volumes sourced; DRI demand derived (method D10).

D.3 Chapters 5 to 7: melt shop, rolling and product quality

Table D.11 Data behind Figure 5.2: tap-to-tap time balance, minutes per heat

Element Phase 1 at 450 kWh/t (heat of about 40 t) Phase 1 at 490 kWh/t (heat of about 40 t) Published design (150 t, 156 MVA)
Power-on 43 47 29.3
Charging 4.0 4.0 3.0
Tapping 3.0 3.0 3.0
Tap-hole preparation 1.5 1.5 1.5
Electrodes 1.0 1.0 1.0
Furnace preparation 0.5 0.5 0.5
Unplanned delay 2.0 2.0 2.0
Net tap-to-tap 55 59 40.3
Furnace hours for about 8,000 heats About 7,300 About 7,900
Finished products at 7,000 to 7,700 h, t 287,000 to 300,000 268,000 to 294,000

Source: Phase 1 derived from RC-1 [S03]: heats of about 40 t; about 25 MW of active power, assumed for a 30 to 33 MVA class transformer at a power factor of about 0.8; times rounded to whole minutes and furnace hours to the nearest hundred; about 8,000 heats at nameplate; finished products capped at the 300,000 t nameplate (methods D8 and D18); benchmark design [S75]. Status: derived and sourced.

Table D.12 Data behind Figure 5.3: EAF electricity by DRI share of the charge, kWh per tonne of liquid steel

DRI/HBI share Line (450 plus DRI penalty) Low High
0% 450 347 500
20% 479 376 529
30% 494 390 544
50% 522 420 572
70% 552 448 602
100% 595 492 645

Source: RC-1 planning value 450 kWh/t [S03], within the IFC range of 347 to 500 [S44], read as all-scrap, plus 14.5 kWh/t per 10% DRI [S20]; at 30% DRI the result, 493.5, is the upper planning value of about 490 kWh/t; EU melt-shop range 404 to 748 kWh/t shown for reference [S42]. Status: derived (method D9).

Table D.13 Data behind Figure 6.2: heating energy for rolling, GJ per tonne

Option Low High Source
Gas reheating furnace, bars and rods (EU BAT range) 0.60 1.90 S49
Gas reheating furnace, billets and beams (EU BAT range) 1.40 2.20 S49
Gas walking-beam furnace, cold charge (RC-1 planning assumption) 1.10 1.60 S03
Same furnace, hot charge at about 700 °C (saving 0.55 GJ/t) 0.55 1.05 S50; derived
Induction heating, partly hot-charged (150 to 400 kWh/t, RC-1 assumption) 0.54 1.44 S03
Rolling (deformation) energy, bars and rods 0.10 0.50 S49

Source: As listed; induction values converted at 3.6 GJ per MWh. CO2 comparison (method D14): gas 1.3 GJ/t ≈ 0.073 t CO2/t; induction 300 kWh/t at 226 g/kWh ≈ 0.068 t CO2/t. Status: sourced, assumed and derived as marked.

Table D.14 Data behind Figure 7.1: ductility classes of BS 4449

Grade Characteristic yield, MPa Agt minimum,% Rm/Re minimum Rm/Re maximum
B500A 500 2.5 1.05 No limit
B500B 500 5.0 1.08 No limit
B500C 500 7.5 1.15 1.35

Source: The Concrete Centre summary of BS 4449:2005+A3:2016 [S29]. Status: sourced. Below 8 mm diameter, class A values differ.

Table D.15 Data behind Figure 7.3: first-year corrosion of carbon steel by ISO 9223 category

Category Thickness loss, µm Mass loss, g/m²
C1 Very low up to 1.3 up to 10
C2 Low 1.3 to 25.0 10 to 200
C3 Medium 25.0 to 50.0 200 to 400
C4 High 50.0 to 80.0 400 to 650
C5 Very high 80.0 to 200.0 650 to 1,500
CX Extreme 200.0 to 700.0 1,500 to 5,500

Source: Šmak et al. (2021), Table 1, reproducing EN ISO 9223 [S98]. Status: sourced. Lower bounds are exclusive.

D.4 Chapter 9: the phased pathway

Table D.16 Data behind Figure 9.1: RC-1 schedule by status

Step Start (year) Bar end (start of year) Status
Front-end engineering, Phase 1; utility agreements 2027 2028 target
ESIA baseline; hearings Q3 2028; certificate Q4 2028 2027 2029 target
Financing; no works before the certificate 2028 2029 target
Phase 1 works, from Q1 2029 to first heat 2029 mid-2030 target
First heat H2 2030; ramp-up through 2031 mid-2030 2032 target
Phase 2: second melt line, light and medium sections 2032 2035 indicative
Phase 3 to 1 Mtpa: melt-shop expansion, heavy sections after 2034 open indicative
Direct-reduction module for Cameroonian ore (later) after 2034 open indicative

Source: Cameroon Steel reference configuration RC-1 (planning estimate), schedule as revised 10 October 2026 [S03]. Bars run to the start of the following year; ’mid-2030’ marks the second half of 2030; Phase 2 is indicative for 2032 to 2034; Phase 3 and the DRI module, which follows later, are shown in the open band ’after 2034’.

Table D.17 Data behind Figure 9.2: electricity demand and carbon intensity by RC-1 phase

Phase Electricity, GWh/yr (at 490 kWh/t) Average load, MW (at 490 kWh/t) Maximum demand, MVA Scope 1 + 2, t CO2/t Incl. upstream of imported DRI, t CO2/t
Phase 1 289.0 (301.7) 36.1 (37.7) 55 0.324 0.578
Phases 1+2 421.6 (442.9) 52.7 (55.4) ≈100 (85 to 110; interpolated, derived) 0.326 0.580
Full 1 Mtpa 753.2 (795.7) 94.1 (99.5) 160 0.328 0.582

Source: Cameroon Steel reference configuration RC-1 (planning estimate), indicative balances at 450 kWh/t in the furnace [S03]; values in brackets at the upper planning value of 490 kWh/t (method D6; intensities then rise by about 0.01 t); average load on an 8,000-hour basis; maximum demand assumed; zone 225 kV line: 100 MW initially, 330 to 400 MW later [S25, S34]; worldsteel benchmarks 0.69 and 1.47 t CO2/t [S01]. Status: derived and assumed.

Table D.18 Data behind Table 9.2: RC-1 indicative balances in absolute values

Item Unit Phase 1 Phases 1 and 2 Full, 1 Mtpa
Finished products t/yr 300,000 500,000 1,000,000
Liquid steel t/yr 319,149 531,915 1,063,830
Iron units (metallics) t/yr 362,669 604,449 1,208,897
DRI/HBI (30% of charge) t/yr 108,801 181,335 362,669
Scrap t/yr 253,868 423,114 846,228
Electricity MWh/yr 288,957 421,596 753,191
Natural gas (reheating) GJ/yr 0 260,000 910,000
Water make-up m³/yr 600,000 1,000,000 2,000,000
Oxygen million Nm³/yr 11.2 18.6 37.2
EAF slag t/yr 44,681 74,468 148,936
EAF dust t/yr 4,787 7,979 15,957
Mill scale t/yr 6,000 10,000 20,000
Scope 1 CO2 t/yr 31,915 67,777 157,434
Scope 2 CO2 t/yr 65,304 95,281 170,221
Upstream CO2 of imported DRI t/yr 76,161 126,934 253,868

Source: Cameroon Steel reference configuration RC-1 (planning estimate), edition 10 October 2026 [S03]; method D6 in Annex A. Status: derived from planned capacities and the benchmark assumptions in Table A.1, with the furnace at 450 kWh/t. Values are unrounded model outputs and should be read to two significant figures.

Sources cited in this chapter

Bracketed markers refer to these sources; the full list is in the annex. Full list of sources

  1. S01Sustainability Indicators 2025 report (2024 data; route table added Feb 2026). worldsteel, Nov 2025, updated Feb 2026.worldsteel.org/wider-sustainability/sustainability-indicators/
  2. S02Iron and Steel Technology Roadmap. International Energy Agency, Oct 2020.iea.blob.core.windows.net/assets/eb0c8ec1-3665-4959-97d0-187ceca189a8/…
  3. S03Cameroon Steel reference configuration RC-1 (planning estimate): phases, benchmarks with ranges and indicative balances for the Kribi steelworks (Class 5), edition 10 October 2026, values as revised on that date. Cameroon Steel, 10 Oct 2026.Cited by title and date
  4. S41World Steel in Figures 2026. worldsteel, 4 Jun 2026.worldsteel.org/data/world-steel-in-figures/world-steel-in-figures-2026…
  5. S45Pedal to the Metal 2026. Global Energy Monitor, May 2026.globalenergymonitor.org/sites/default/files/2026-05/Pedal%20to%20the%2…
  6. S58Commercial Metals Company to invest $300 million in its third micro mill (project announced in August 2020). Steel Technology, Undated, accessed Oct 2026.steel-technology.com/projects/commercial-metals-company-to-invest-300-…
  7. S57Nucor to build new rebar micro mill in North Carolina. Nucor Corporation, 7 Apr 2022.nucor.com/news-release/nucor-to-build-new-rebar-micro-mill-in-north-ca…
  8. S59West Virginia announces Commercial Metals Company to build $450 million micro steelmaking mill in Berkeley County. WV Press, 8 Dec 2022.wvpress.org/breaking-news/west-virginia-announces-commercial-metals-co…
  9. S56Making Net-Zero Steel Possible. Mission Possible Partnership, Sep 2022.missionpossiblepartnership.org/wp-content/uploads/2026/10/Making-Net-Z…
  10. S60Le turc Tosyali va construire un nouveau complexe sidérurgique en Algérie. Managers.tn, 27 Apr 2026.managers.tn/2026/04/27/lalgerie-attire-les-grands-le-turc-tosyali-va-y…
  11. S05UN Comtrade public API: Cameroon (reporter 120), HS 72 and 73 and six-digit lines, 2019 to 2023. United Nations Statistics Division.comtradeapi.un.org/public/v1/preview/C/A/HS?reporterCode=120&period=20…
  12. S67Commerce extérieur du Cameroun en 2020. Institut National de la Statistique (INS), Cameroon, Jul 2021.ins-cameroun.cm/wp-content/uploads/2025/07/Note-Commerce-exterieur-202…
  13. S70Note sur le commerce extérieur 2022. Institut National de la Statistique (INS), Cameroon, Dec 2023, revised 13 Feb 2024.ins-cameroun.cm/wp-content/uploads/2025/07/Note-sur-le-Commerce-Exteri…
  14. S71Commerce extérieur du Cameroun en 2023. Institut National de la Statistique (INS), Cameroon, Apr 2024.ins-cameroun.cm/wp-content/uploads/2025/07/Note-sur-le-Commerce-Exteri…
  15. S13Bidoung J., Fomethe A., Yantio G., Melo U., La récupération et le recyclage des déchets ferromagnétiques: analyse de la situation au Cameroun, Déchets, Revue francophone d’écologie industrielle n°48. ENSP Yaoundé and MIPROMALO, Q4 2007.eid.episciences.org/7942/pdf
  16. S32Cameroun: Prometal décroche 26,2 milliards FCFA d’Afreximbank. Camer.be, 1 Oct 2026.camer.be/actualites/economie/cameroun-prometal-decroche-262-milliards-…
  17. S3340 millions d’euros d’Afreximbank: Prometal sécurise ses billettes d’acier alors que la ferraille camerounaise s’épuise. Cameroun24, 10 Oct 2026.cameroun24.net/article/76267-40-millions-d-euros-d-afreximbank-prometa…
  18. S74Métallurgie: les industriels dénoncent la présence du fer à béton contrefait. EcoMatin, 22 Jun 2023.ecomatin.net/metallurgie-les-industriels-du-secteur-denoncent-la-prese…
  19. S18Mbalam-Nabeba resources and reserves as at 20 May 2015 (JORC Code). Previous holder of the Mbalam permit (ASX-listed company disclosure), 2015.Cited by title and date
  20. S19Mbalam iron ore project: presentation to Mining Indaba 2014 (metallurgical testwork on itabirite). Previous holder of the Mbalam permit (ASX-listed company disclosure), Feb 2014.Cited by title and date
  21. S16Climate change and the production of iron and steel (policy paper). worldsteel.worldsteel.org/climate-action/climate-change-and-the-production-of-iro…
  22. S17Global high-grade iron ore market is set to grow (S. Basirat). Institute for Energy Economics and Financial Analysis (IEEFA), Mar 2026.ieefa.org/sites/default/files/2026-03/IEEFA_Global%20high-grade%20iron…
  23. S20ENERGIRON technology: DRI-EAF production route using natural gas or H2. European Commission, Innovation Centre for Industrial Transformation, Referenced 12 Feb 2026.innovation-centre-for-industrial-transformation.ec.europa.eu/innovativ…
  24. S14Direct Reduced Iron (DRI): specifications and handling. International Iron Metallics Association, Undated, accessed Oct 2026.metallics.org/dri.html
  25. S21Données pétrolières 2025. Société Nationale des Hydrocarbures (SNH), Jun 2026.snh.cm/wp-content/uploads/2026/06/Donnees-petrolieres-2025.pdf
  26. S75BSE-EAF: future-proof melting automated system for safe, reliable and efficient steelmaking (R. Schweikle, J. Apfel, A. Pezza), DOI 10.36146/2026_06_50. La Metallurgia Italiana (AIM), Jun 2026.aimnet.it/la_metallurgia_italiana/2026/giugno/Aim_giugno2026_6.pdf
  27. S44Environmental, Health, and Safety Guidelines for Integrated Steel Mills. IFC, World Bank Group, 30 Apr 2007.ifc.org/content/dam/ifc/doc/2000/2007-integrated-steel-mills-ehs-guide…
  28. S42Best Available Techniques Reference Document for Iron and Steel Production (EUR 25521). European Commission, Joint Research Centre, 2013.bureau-industrial-transformation.jrc.ec.europa.eu/sites/default/files/…
  29. S29Standards for reinforcement (BS 4449:2005+A3:2016 grades). The Concrete Centre, Undated, accessed Oct 2026.concretecentre.com/Codes/European-standards-for-reinforcement.aspx
  30. S98Šmak M., Kubíček J., Kala J., Podaný K., Vaněrek J., The influence of hot-dip galvanizing on the mechanical properties of high-strength steels, Materials 14(18):5219, doi:10.3390/ma14185219. MDPI (via PubMed Central PMC8467660), 2021.pmc.ncbi.nlm.nih.gov/articles/PMC8467660/
  31. S25Kribi franchit la ligne électrique 225 kV. Port Autonome de Kribi, 6 Aug 2025.Cited by title and date
  32. S34Énergie et infrastructures: un nouvel élan pour la compétitivité du Port de Kribi. Port Autonome de Kribi, 19 Aug 2026.Cited by title and date

Cite this chapter

Cameroon Steel (2026). Electric steelmaking is the right route for Central Africa. White paper 03, annex D: Data tables. CS-WP-03. https://www.cameroon-steel.com/en/library/technology-routes/annex-data/