Contact

Language

From mineral resource to industrial value

Labs · Steel route lab

Which steelmaking route uses the least energy and emits the least CO₂?

Scrap in an electric furnace. On Cameroon’s grid, Phase 1, with imported direct-reduced iron, would emit about 0.58 t of CO₂ per tonne, against 2.29 t for the blast furnace.

Inputs

g/kWh

Value used: 226 g CO₂/kWh, Ember’s figure for 2024, when hydropower supplied about 72% of electricity. ARSEL reports about 90% for 2025: the site keeps the more prudent 2024 factor; the “2025 mix” button shows the sensitivity: it sets the slider to 85 g, the midpoint of the range of about 74 to 96 g given in White paper 06 (order of magnitude).

%

Result

Derived

On a grid at 226 g CO₂/kWh, Cameroon Steel’s Phase 1 would emit about 0.58 t of CO₂ per tonne of product, imported direct-reduced iron included: 75% less than the blast-furnace route (2.29 t). At this level, hydrogen direct reduction beats gas-based reduction; it loses the edge above about 370 g/kWh.

0.58t CO₂/t

Cameroon Steel, Phase 1

2.29t CO₂/t

Blast furnace, same grid

75%

Reduction against the blast furnace

370g/kWh

Threshold where hydrogen beats gas

963kWh/t

Phase 1 electricity per tonne

Four readings of one question

Five routes, three measures, one grid

CO₂ per tonne (t CO₂/t)

0.00.51.01.52.02.53.03.5Blast furnace2.29Gas DRI1.26Hydrogen DRI0.87Scrap0.53Cameroon Steel P10.58

Sensitivity to the power grid (t CO₂/t)

01230300600900CameroonWorldHydrogen DRIBlast furnaceGas DRICameroon Steel P1Scrap226 g/kWh

horizontal axis: g CO₂/kWh; vertical axis: t CO₂/t

Final energy per tonne (GJ/t)

0510152025Blast furnace21.4Gas DRI17.1Hydrogen DRI12.2Scrap2.1Cameroon Steel P17.1

Electricity per tonne (kWh/t)

01,0002,0003,000Blast furnace150Gas DRI680Hydrogen DRI3,400Scrap520Cameroon Steel P1963
CO₂ bars: grey is the part the grid does not change (direct and upstream emissions), orange the electricity part. Light tick: worldsteel 2024 world average. Cameroon Steel per tonne of finished product (rolling included); other routes per tonne of crude steel. The scrap row is a world average on worldsteel’s boundary, which also counts reheating fuel and the upstream of purchased inputs such as lime and oxygen; the Cameroon Steel row counts furnace emissions, electricity and imported iron only. The two are not on the same basis.
CO₂ per tonne, Final energy per tonne, Electricity per tonne
Routet CO₂/tGJ/tkWh/t
Blast furnace2.2921.4150
Gas DRI1.2617.1680
Hydrogen DRI0.8712.23,400
Scrap0.532.1520
Cameroon Steel P10.587.1963

Model assumptions

25 assumptions
ParameterValue usedRangeStatusSource
Carbon intensity of the Cameroon grid (2024)226 g CO₂/kWh200 – 300SourcedEmber via Our World in Data, carbon intensity of electricity generation: Cameroon 225.9 g CO₂e/kWh in 2024, when hydropower supplied about 72% of generation; ARSEL reports about 90% hydro for 2025; the 2024 factor is kept as the prudent value
Sensitivity: Cameroon grid at the 2025 mix85 g CO₂/kWh74 – 96IllustrativeOrder of magnitude, not a published factor: the 2025 mix reported by ARSEL (7,272.4 of 8,119.9 GWh from hydropower, about 10% thermal) combined with the thermal intensity implied by the Ember 2024 value (225.9 g/kWh with about 28% non-hydro generation); range of White paper 06, Chapter 3: about 74 g/kWh counting combustion only, about 96 g/kWh with life-cycle factors for hydro and solar; the tools use the midpoint
Grid factor implicit in the world averages538 g CO₂/kWh450 – 550AssumptionIEA Iron and Steel Technology Roadmap (2020) world grid factor 538 g/kWh, used here to split the worldsteel averages into an electricity part and the rest
CO₂ intensity, blast furnace (world average)2.34 t CO₂/t—Sourcedworldsteel, Sustainability Indicators 2025 (2024 data)
CO₂ intensity, direct reduction (world average)1.47 t CO₂/t—Sourcedworldsteel, Sustainability Indicators 2025 (2024 data)
CO₂ intensity, scrap electric furnace (world average)0.69 t CO₂/t—Sourcedworldsteel, Sustainability Indicators 2025 (2024 data)
Final energy, blast furnace21.4 GJ/t—SourcedIEA, Iron and Steel Technology Roadmap (Oct 2020), final energy by route
Final energy, gas DRI and electric furnace17.1 GJ/t—SourcedIEA, Iron and Steel Technology Roadmap (Oct 2020), final energy by route
Final energy, scrap and electric furnace2.1 GJ/t—SourcedIEA, Iron and Steel Technology Roadmap (Oct 2020), final energy by route
Purchased electricity, blast furnace150 kWh/t50 – 300AssumptionPlanning assumption: integrated works generate most of their own power from process gases
Electricity, gas DRI and electric furnace680 kWh/t550 – 800DerivedEC JRC BREF (2013) EAF 404–748 kWh/t; +14.5 kWh/t per +10% DRI in the charge; Energiron ~73 kWh/t DRI (EC ICIT)
Electricity, hydrogen DRI (electrolysis included)3,400 kWh/t3,200 – 3,600DerivedAbout 54 kg H₂ per t DRI and 2.4–2.8 MWh/t DRI of electrolysis (Midrex, IEA), plus the electric furnace: 3.2–3.6 MWh/t of steel
Electricity, scrap and electric furnace520 kWh/t404 – 748DerivedEAF 450 kWh/t (IFC EHS 2007, range 347–500) plus 70 kWh/t ladle furnace and auxiliaries (RC-1)
Non-electric emissions, hydrogen DRI0.10 t CO₂/t0.05 – 0.15AssumptionPlanning assumption, same order as the electric-furnace direct emissions of RC-1 (0.06–0.15 t/t); IEA near-zero threshold 0.40 t/t
Direct furnace emissions (electrodes, carbon, lime)0.10 t CO₂/t liquid steel0.06 – 0.15AssumptionCameroon Steel reference configuration RC-1, edition 10 Oct 2026 (planning estimate, not a design figure): 0.06–0.15 t/t
Upstream emissions of imported DRI (gas-based)0.7 t CO₂/t DRI0.5 – 0.9AssumptionCameroon Steel reference configuration RC-1, edition 10 Oct 2026 (planning estimate, not a design figure): gas-based shaft furnace, 0.5–0.9 t/t
Electric arc furnace electricity450 kWh/t liquid steel347 – 500SourcedIFC EHS Guidelines for Integrated Steel Mills (2007): 1,250–1,800 MJ/t = 347–500 kWh/t; RC-1 uses 450
Extra electricity per point of DRI above 30%1.45 kWh/t per point of DRI1.00 – 2.00DerivedEC ICIT, Energiron: +14.5 kWh/t per +10% DRI in the charge
Ladle furnace, caster, oxygen, water, compressed air, lighting70 kWh/t liquid steel50 – 100AssumptionCameroon Steel reference configuration RC-1, edition 10 Oct 2026 (planning estimate, not a design figure): 50–100 kWh/t
Rolling110 kWh/t product70 – 140SourcedIFC EHS Guidelines (2007): rolling 70–140 kWh/t
Electric billet reheating (induction, partly hot-charged)300 kWh/t product150 – 400AssumptionCameroon Steel reference configuration RC-1, edition 10 Oct 2026 (planning estimate, not a design figure): 150–400 kWh/t
Casting and rolling yield0.94 t/t0.92 – 0.96AssumptionCameroon Steel reference configuration RC-1, edition 10 Oct 2026 (planning estimate, not a design figure): 0.92–0.96
Metallic yield of scrap in the furnace0.90 t/t0.88 – 0.92AssumptionCalibrated so that a 70/30 scrap–DRI charge gives the RC-1 melt-shop yield of 0.88 (range 0.85–0.91)
Metallic yield of DRI in the furnace0.833 t/t0.800 – 0.870AssumptionDRI carries 6–8% gangue and unreduced oxide; calibrated with the scrap yield on the RC-1 value 0.88
Natural gas for direct reduction (upstream)10.0 GJ/t DRI9.5 – 11.0AssumptionMidrex ~9.8 GJ/t; Energiron ~10 GJ/t; Suez Steel 9.2 GJ/t (2026)

How this is calculated

For each reference route, the world intensity published by worldsteel (I) is split into an electricity part, E × gref, and a remainder R = I − E × gref, where E is the electricity used per tonne and gref = 538 g/kWh the IEA world grid factor. On a grid g the intensity is R + E × g: at 538 g/kWh the model returns exactly 2.34, 1.47 and 0.69 t CO₂/t. The hydrogen route is computed the same way with 3,400 kWh/t (electrolysis included) and a 0.10 t remainder.

Cameroon Steel’s Phase 1 is built piece by piece from the RC-1 reference configuration, per tonne of finished product: direct furnace emissions (0.10 t per tonne of liquid steel), upstream emissions of imported direct-reduced iron (0.7 t per tonne of DRI), and all site electricity, furnace, ladle, rolling and induction reheating included (963 kWh/t by default), multiplied by g. Each point of DRI above 30% adds 1.45 kWh/t to the furnace. Tonnages follow from the yields: liquid steel = products ÷ 0.94; metallic charge = liquid steel ÷ Y, where Y is the furnace yield of scrap (0.90) and of direct-reduced iron (0.833) weighted by their shares, as in the value-chain explorer. Y is 0.88 at 30% DRI and falls as that share rises (0.833 at 100%), so more DRI is needed per tonne of steel.

Limits. World averages blend very different plants; calculation boundaries (crude steel or finished product, upstream included or not) differ slightly between sources; energy is final energy (IEA), not primary. Indicative results, to be replaced by verified measurements in operation.