数据表

Data tables behind the figures

阅读(英文)
20分钟
篇幅(英文)
4571词
版本日期
2026年10月10日

本附录未收入中文摘要版,以下为英文原文。

本章目录(10)
  1. D.1 Executive summary and Chapter 1: steel and climate
  2. D.2 Chapter 2: accounting for carbon in steel
  3. D.3 Chapter 3: the grid factor
  4. D.4 Chapter 4: an illustrative footprint
  5. D.5 Chapter 5: carbon border measures
  6. D.6 Chapter 6: green iron
  7. D.7 Chapter 7: climate risk and adaptation
  8. D.8 Chapter 8: circularity
  9. D.9 Chapter 9: finance and standards
  10. D.10 Chapter 10: pathway and recommendations

This annex prints the values plotted in each of the 31 figures of the paper, so that readers can check them, reuse them and cite them without reading values off a graphic. The tables are generated directly from the data files published with the web edition (one JSON file per exhibit, written by the same script that draws the charts), so they cannot drift from the figures. Each table states its unit and the status of its values (sourced, derived, assumed or illustrative, as defined in Annex A), and repeats the source line of the figure. Values are rounded as in the figures; totals are computed before rounding. Where a figure plots a continuous line, the table gives the values at regular steps; the model in Annex A reproduces any intermediate point. A few columns that are not plotted but help to read a figure (shares of a total, differences, Scopes 1 and 2 subtotals) are added and identified as such.

D.1 Executive summary and Chapter 1: steel and climate

Figure ES.1: RC-1 against worldsteel route averages

World route averages are per tonne of crude steel and are not split by scope in the figure; RC-1 values are per tonne of finished product, split by scope as in the bars.

Table D.1 Values plotted in Figure ES.1, t CO2 per tonne

Series Scope 1 Scope 2 (226 g/kWh) Upstream DRI/HBI Total Basis Status
BF-BOF, world average 2.34 per t crude steel sourced
World average, all routes 1.92 per t crude steel sourced
DRI-EAF, world average 1.47 per t crude steel sourced
Scrap-EAF, world average 0.69 per t crude steel sourced
RC-1 full build-out (1 Mtpa) 0.16 0.17 0.25 0.58 per t product derived
RC-1 Phase 1 (0.3 Mtpa) 0.11 0.22 0.25 0.58 per t product derived

On the per-tonne-of-crude-steel basis of the benchmarks, the RC-1 totals are 0.54 (Phase 1) and 0.55 (full build-out).

Source: worldsteel Sustainability Indicators 2025 (2024 data) [S01]; Cameroon Steel reference configuration RC-1 (planning estimate), edition 10 October 2026 [S90]; WP06 model (Annex A). Blank cells: not split in the source.

Figure 1.1: carbon intensity by route

Sustainability indicators of worldsteel for 2024, covering Scopes 1, 2 and upstream emissions, per tonne of crude steel.

Table D.2 Values plotted in Figure 1.1, tonnes per tonne of crude steel (sourced)

Route t CO2 t CO2e
BF-BOF, world average 2.34 2.66
DRI-EAF, world average 1.47 1.66
Scrap-EAF, world average 0.69 0.71
World average, all routes 1.92 2.18

Source: worldsteel, Sustainability Indicators 2025 report, route table added February 2026 [S01].

Figure 1.2: direct and indirect emissions by route

IEA estimates for 2019. Indirect emissions (electricity and imported intermediates) are the difference between the two published values; they are computed at a world grid factor of 538 g/kWh.

Table D.3 Values plotted in Figure 1.2, t CO2 per tonne of crude steel (sourced)

Route Direct Indirect (difference) Direct and indirect
BF-BOF 1.20 1.00 2.20
Gas DRI-EAF 1.00 0.40 1.40
Scrap EAF 0.04 0.26 0.30
Global average 1.40 0.60 2.00

Source: IEA, Iron and Steel Technology Roadmap (2020) [S05].

Figure 1.3: electric-arc share of output and capacity

Share of crude steel made in electric furnaces, and share of the world’s steelmaking capacity under development that is electric.

Table D.4 Values plotted in Figure 1.3,% of the total (sourced)

Series Electric Oxygen and other
World crude steel output, 2025 30.3% 69.7%
Africa crude steel output, 2025 89.0% 11.0%
World capacity in development, 2026 50.0% 50.0%

Source: worldsteel, World Steel in Figures 2026 [S03]; Global Energy Monitor, Pedal to the Metal 2026 [S14].

D.2 Chapter 2: accounting for carbon in steel

Figure 2.1: what each framework counts

The matrix behind the figure, simplified by Cameroon Steel. Columns: (a) furnace and ladle-furnace carbon; (b) on-site gas; (c) grid power; (d) imported iron units; (e) lime, alloys and electrodes; (f) inbound freight; (g) use and recycling.

Table D.5 Values plotted in Figure 2.1: counted (yes), partly counted (partly) or not counted (no) (sourced)

Framework (a) (b) (c) (d) (e) (f) (g)
GHG Protocol Scope 1 yes yes no no no no no
GHG Protocol Scope 2 no no yes no no no no
EP4 threshold (Scopes 1+2) yes yes yes no no no no
EU CBAM, iron and steel yes yes no yes no no no
ISO 14404 / worldsteel yes yes yes yes partly no no
ResponsibleSteel, IEA near-zero yes yes yes yes partly no no
Product footprint, cradle to gate yes yes yes yes yes yes no
EPD incl. end-of-life (module D) yes yes yes yes yes yes yes

Source: GHG Protocol [S45]; Equator Principles EP4 [S22]; Regulation (EU) 2023/956, Annex II [S27]; ISO 14404 series [S41][S43]; ResponsibleSteel [S37]; IEA [S06]; ISO 14067 [S46]; EN 15804+A2 [S47]. Simplification by Cameroon Steel.

Figure 2.2: one plant, seven numbers

The same RC-1 Phase 1 tonne at nameplate output (0.3 Mtpa) under seven reporting perimeters.

Table D.6 Values plotted in Figure 2.2, t CO2 per tonne

Perimeter t CO2/t Status
Scope 1 only (direct) 0.11 derived
Scopes 1+2, hydro contract (market-based) 0.11 derived
Scopes 1+2, grid 96 g/kWh (2025 check) 0.20 derived
Scopes 1+2, grid 226 g/kWh (2024) 0.32 derived
EU CBAM basis (direct + DRI, no power) 0.36 illustrative
ISO 14404 basis, per t crude steel 0.54 derived
ISO 14404 basis, per t product 0.58 derived

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; grid factors from Ember via Our World in Data [S48] and ARSEL [S50]; CBAM perimeter from Regulation (EU) 2023/956 [S27].

D.3 Chapter 3: the grid factor

Figure 3.1: Cameroon’s generation mix and grid intensity

Left panel: generation by source in 2024 (Ember) and 2025 (ARSEL). Right panel: average grid intensity, 2010 to 2024, and the derived 2025 cross-check (Annex A).

Table D.7 Values plotted in Figure 3.1 (left): generation by source (sourced)

Source 2024, TWh 2024, share 2025, TWh 2025, share
Hydro 5.23 72.0% 7.27 89.6%
Gas 1.60 22.0% 0.56 6.9%
Oil 0.35 4.8% 0.22 2.7%
Solar 0.04 0.6% 0.07 0.8%
Bioenergy 0.04 0.6% 0.00 0.0%
Total 7.26 100% 8.12 100%

Table D.8 Values plotted in Figure 3.1 (right): average grid intensity, g CO2e/kWh (sourced)

Year g/kWh Year g/kWh Year g/kWh
2010 206 2015 337 2020 320
2011 192 2016 300 2021 298
2012 168 2017 288 2022 281
2013 240 2018 324 2023 224
2014 282 2019 306 2024 226

2025 cross-check (derived; an estimate): 74 g/kWh counting combustion only and 96 g/kWh adding life-cycle emissions of renewables, using the fossil emission rate implied by the 2024 data (771 g/kWh of fossil generation).

Source: Ember via Our World in Data, carbon intensity and generation by source [S48][S49]; ARSEL, Rapport d’activités 2025 [S50]; life-cycle factors for hydro (24 g), solar (48 g) and bioenergy (230 g) from IPCC AR5 Annex III [S58]. 2025 cross-check derived by Cameroon Steel (Annex A).

Figure 3.2: grid intensities compared

Average carbon intensity of electricity generation in 2024, in ascending order.

Table D.9 Values plotted in Figure 3.2, g CO2e/kWh, 2024 (sourced)

Country or region g/kWh Country or region g/kWh
Ethiopia 23 Turkey 470
Norway 30 World 471
Namibia 49 Nigeria 496
Kenya 85 China 555
Brazil 106 Egypt 574
European Union (27) 211 Algeria 633
Cameroon 226 Indonesia 680
Germany 336 India 705
United States 384 South Africa 717

Source: Ember via Our World in Data, carbon intensity of electricity generation, accessed 10 October 2026 [S48].

Figure 3.3: RC-1 Phase 1 intensity against the grid factor

Values of the two lines every 50 g/kWh, and at the four marked points. The intensity is linear in the grid factor; the line including upstream iron units crosses the worldsteel scrap-EAF average (0.69) at about 343 g/kWh.

Table D.10 Values plotted in Figure 3.3, t CO2 per tonne of product (derived)

Grid factor, g CO2/kWh Scopes 1+2 Scopes 1+2 + upstream DRI/HBI
0 0.11 0.36
50 0.15 0.41
100 0.20 0.46
150 0.25 0.50
200 0.30 0.55
250 0.35 0.60
300 0.40 0.65
350 0.44 0.70
400 0.49 0.75
450 0.54 0.79
500 0.59 0.84
550 0.64 0.89
600 0.68 0.94
650 0.73 0.99
700 0.78 1.03
750 0.83 1.08
800 0.88 1.13

Table D.11 Marked points in Figure 3.3 (derived)

Grid g CO2/kWh Scopes 1+2 Including upstream
Cameroon 2024 226 0.32 0.58
World 471 0.56 0.81
China 555 0.64 0.90
South Africa 717 0.80 1.05

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; grid factors from Ember via Our World in Data [S48]; worldsteel route averages [S01].

D.4 Chapter 4: an illustrative footprint

Figure 4.1: process chain and emission points

Figure 4.1 is a diagram. The table lists its elements, the emission point each carries and the RC-1 planning values shown on it.

Table D.12 Elements of Figure 4.1 (illustrative)

Element RC-1 planning value Emission point
Scrap about 70% of the metallic charge no emission point shown
Imported DRI/HBI about 30% of the metallic charge upstream: DRI made abroad
Electric arc furnace 40 t class Scope 1: electrodes, charge carbon, lime; Scope 2
Ladle furnace Scope 2
Billet caster Scope 2
Reheating induction (Phase 1) or gas (Phases 2 and 3) Scope 2 (induction); Scope 1 (gas, Phases 2 and 3)
Wire-rod and rebar mills, or merchant billets sections later Scope 2
Grid supply 225 kV, hydro-dominated, 226 g/kWh in 2024 Scope 2: electricity

Source: Cameroon Steel reference configuration RC-1 (planning estimate) [S90]. Simplified diagram.

Figure 4.2: annual footprint by phase

Annual emissions at nameplate output, in thousand tonnes of CO2 (kt). The Equator Principles threshold drawn on the figure is 100 kt of Scopes 1 and 2 a year.

Table D.13 Values plotted in Figure 4.2, kt CO2 per year (derived)

Phase Scope 1 Scope 2 Scopes 1+2 Upstream DRI/HBI Total
Phase 1, 0.3 Mtpa 31.9 65.3 97.2 76.2 173.4
Phases 1+2, 0.5 Mtpa 67.8 95.3 163.1 126.9 290.0
Full build-out, 1.0 Mtpa 157.4 170.2 327.7 253.9 581.5

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; Equator Principles EP4 [S22].

Figure 4.3: a tonne of Phase 1 product, by source

Components of the RC-1 Phase 1 intensity per tonne of reinforcing bar and wire rod.

Table D.14 Values plotted in Figure 4.3, t CO2 per tonne of finished product (derived)

Component t CO2/t Share of total
EAF and ladle furnace, direct (Scope 1) 0.106 18%
Melt-shop electricity (Scope 2) 0.125 22%
Induction heating (Scope 2) 0.068 12%
Rolling electricity (Scope 2) 0.025 4%
Scopes 1+2 0.324 56%
Upstream imported DRI/HBI 0.254 44%
Total 0.578 100%

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90] (Annex A).

Figure 4.4: one-at-a-time sensitivity

Change in the RC-1 Phase 1 intensity when each parameter is set to the low and high ends of its range, all others central. Base: 0.578 t CO2/t including upstream iron units; 0.324 t CO2/t for Scopes 1 and 2. The DRI-share case includes the furnace electricity penalty for DRI. The figure plots the total; the Scopes 1 and 2 columns are added for reference.

Table D.15 Values plotted in Figure 4.4, change in t CO2 per tonne of product (derived)

Parameter and range (low to high) Total, low Total, high Scopes 1+2, low Scopes 1+2, high
Imported DRI share of charge, 20% to 50% −0.088 +0.176 −0.003 +0.007
Upstream factor of DRI/HBI, 0.5 to 0.9 t/t −0.073 +0.073 0.000 0.000
Grid emission factor, 200 to 300 g/kWh −0.025 +0.071 −0.025 +0.071
EAF direct factor, 0.06 to 0.15 t/t liquid −0.043 +0.053 −0.043 +0.053
Induction heating, 150 to 400 kWh/t −0.034 +0.023 −0.034 +0.023
EAF electricity, 347 to 500 kWh/t −0.025 +0.012 −0.025 +0.012
Cast-and-roll yield, 0.96 to 0.92 −0.010 +0.011 −0.005 +0.005
Metallic yield, 0.91 to 0.85 −0.008 +0.009 0.000 0.000
Rolling electricity, 70 to 140 kWh/t −0.009 +0.007 −0.009 +0.007
Auxiliary electricity, 50 to 100 kWh/t −0.005 +0.007 −0.005 +0.007

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; DRI power penalty of about 14.5 kWh/t per 10 points of DRI in the charge from the EC Innovation Centre for Industrial Transformation [S15].

Figure 4.5: DRI share and upstream intensity

RC-1 Phase 1 intensity including upstream iron units, t CO2 per tonne of product, grid at 226 g/kWh. Columns: imported DRI/HBI share of the metallic charge (balance scrap). Rows: upstream intensity of the DRI/HBI, t CO2 per tonne. The RC-1 base is the cell at 30% and 0.7 t/t.

Table D.16 Values plotted in Figure 4.5, t CO2 per tonne of product (derived)

Upstream t/t 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60%
0.1 0.33 0.34 0.34 0.35 0.36 0.37 0.38 0.38 0.39 0.40 0.41
0.2 0.34 0.36 0.37 0.38 0.40 0.41 0.42 0.44 0.45 0.47 0.48
0.3 0.35 0.37 0.39 0.41 0.43 0.45 0.47 0.49 0.51 0.53 0.55
0.4 0.37 0.39 0.42 0.44 0.47 0.50 0.52 0.55 0.57 0.60 0.62
0.5 0.38 0.41 0.44 0.47 0.51 0.54 0.57 0.60 0.63 0.67 0.70
0.6 0.39 0.43 0.47 0.50 0.54 0.58 0.62 0.66 0.69 0.73 0.77
0.7 0.40 0.45 0.49 0.53 0.58 0.62 0.67 0.71 0.75 0.80 0.84
0.8 0.41 0.46 0.51 0.56 0.61 0.66 0.71 0.76 0.81 0.86 0.91
0.9 0.43 0.48 0.54 0.59 0.65 0.71 0.76 0.82 0.88 0.93 0.99
1.0 0.44 0.50 0.56 0.62 0.69 0.75 0.81 0.87 0.94 1.00 1.06

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; DRI power penalty from [S15]; hydrogen-based iron range discussed in Chapter 6.

D.5 Chapter 5: carbon border measures

Figure 5.1: CBAM phase-in

The CBAM factor is the share of the benchmark still covered by free allocation in the adjustment; the remainder is charged at the border.

Table D.17 Values plotted in Figure 5.1,% of the CBAM benchmark (sourced)

Year CBAM factor (free allocation) Phased out, charged at the border
2026 97.5% 2.5%
2027 95.0% 5.0%
2028 90.0% 10.0%
2029 77.5% 22.5%
2030 51.5% 48.5%
2031 39.0% 61.0%
2032 26.5% 73.5%
2033 14.0% 86.0%
2034 0.0% 100.0%

Source: Directive (EU) 2023/959 amending the EU ETS Directive, free-allocation phase-out schedule [S28]; CBAM implementing rules [S31].

Figure 5.2: gross CBAM charge on the CBAM basis

Gross charge per tonne at a CBAM certificate price of €82.32/t CO2, before the free-allocation adjustment and before any carbon price paid at origin, on the CBAM basis for steel (direct and precursor emissions, purchased electricity not counted). Ore-based routes are ranges: low end, IEA direct-emission estimate; high end, worldsteel 2024 all-scope average.

Table D.18 Values plotted in Figure 5.2 (illustrative)

Series t CO2/t, CBAM basis € per tonne, gross
BF-BOF average 1.20 to 2.34 99 to 193
Gas-based DRI-EAF average 1.00 to 1.47 82 to 121
RC-1 full build-out 0.41 34
RC-1 Phase 1 0.36 30
RC-1 Phase 1, DRI bought at 0.5 t/t 0.29 24
All-scrap EAF (RC-1 model, no DRI) 0.11 9

Source: European Commission, price of CBAM certificates [S26]; Regulation (EU) 2023/956, Annex II [S27]; IEA [S05]; worldsteel [S01]; WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90].

Figure 5.3: net CBAM charge over time

Net charge per tonne at a constant €82.32/t CO2 on the CBAM basis, after deducting the benchmark multiplied by the CBAM factor of each year. Benchmarks applied (t CO2/t, as reported for hot-rolled coil and used as a proxy for long products): BF-BOF 1.370, DRI-EAF 0.481, scrap-EAF 0.072; RC-1 and the all-scrap furnace are assessed against the scrap-EAF benchmark. Ore-based routes are shown as ranges (low to high).

Table D.19 Values plotted in Figure 5.3, € per tonne (illustrative)

Year RC-1 Phase 1 RC-1 full build-out All-scrap EAF BF-BOF Gas DRI-EAF
2026 23.9 28.1 3.0 0 to 83 44 to 82
2027 24.0 28.2 3.1 0 to 85 45 to 83
2028 24.3 28.5 3.4 0 to 91 47 to 85
2029 25.1 29.3 4.2 11 to 105 52 to 90
2030 26.6 30.8 5.7 41 to 135 62 to 101
2031 27.3 31.5 6.4 55 to 149 67 to 106
2032 28.1 32.3 7.2 69 to 163 72 to 111
2033 28.8 33.0 7.9 83 to 177 77 to 115
2034 29.7 33.9 8.8 99 to 193 82 to 121

Source: as Figure 5.2; benchmarks as reported for hot-rolled coil, used as a proxy for long products [S31][S104]; CBAM factor [S28].

D.6 Chapter 6: green iron

Figure 6.1: ore-based route intensities

Published and derived intensities of ore-based steelmaking routes, t CO2 (or CO2e) per tonne of steel. Energiron values are derived by applying the stated percentages to the worldsteel blast-furnace average of 2.34.

Table D.20 Values plotted in Figure 6.1, t CO2 per tonne

Route t CO2/t Status Source
BF-BOF, world average 2.34 sourced [S01]
Gas DRI-EAF, world average 1.47 sourced [S01]
Energiron with natural gas (53% below BF-BOF) 1.10 derived [S15]
Saarstahl/Dillinger plan, gas DRI-EAF 1.10 sourced [S18]
RC-1 Phase 1, 30% imported DRI (per t product) 0.58 derived [S90]
Saarstahl/Dillinger, green hydrogen and green power 0.34 sourced [S18]
Energiron with 100% hydrogen (86% below BF-BOF) 0.33 derived [S15]

The IEA near-zero threshold drawn on the figure is 0.40 t CO2e per tonne of crude steel at 0% scrap [S06].

Source: worldsteel [S01]; EC Innovation Centre for Industrial Transformation, Energiron and POWER4STEEL pages [S15][S18]; IEA near-zero threshold [S06]; WP06 model [S90]. Energiron values derived by applying the stated percentages to the worldsteel blast-furnace average.

Figure 6.2: direct-reduced iron output, 2025

Output in million tonnes (Mt); world total 151.0 Mt.

Table D.21 Values plotted in Figure 6.2, Mt of DRI, 2025 (sourced)

Producer Mt Share of world output
India 58.80 38.9%
Iran 37.20 24.6%
Algeria 6.70 4.4%
Egypt 6.06 4.0%
Libya 1.75 1.2%
Sub-Saharan Africa 0.09 0.1%

Source: Midrex Technologies, 2025 World Direct Reduction Statistics [S13]; East African estimate from worldsteel, World Steel in Figures 2026 [S03].

Figure 6.3: electricity for hydrogen-based direct reduction

Annual electricity, TWh. Hydrogen requirement 54 kg H2 per tonne of DRI; electrolysis 45 to 52 MWh per tonne of H2.

Table D.22 Values plotted in Figure 6.3, TWh per year

Item Low High Status
Hydrogen for RC-1’s iron units at 1 Mtpa (0.36 Mt DRI) 0.88 1.02 derived
Hydrogen for a 1 Mt/yr DR module 2.43 2.81 derived
Nachtigal hydro, 12 months to May 2026 3.61 3.61 sourced
Cameroon total generation, 2025 8.12 8.12 sourced

Source: hydrogen requirement [S17]; electrolyser efficiency [S05]; Nachtigal output [S52]; national generation [S50]; hydro potential [S53]. Derived by Cameroon Steel (Annex A).

Figure 6.4: a stepwise route to green iron

Figure 6.4 is a diagram. Each step is optional and gated; none is a commitment of this paper.

Table D.23 Elements of Figure 6.4 (illustrative)

Step Configuration Gate
1. From the first heat (2030) Scrap and certified imported DRI/HBI measure, verify, buy low-carbon iron units
2. Later, after the main phases Domestic gas-based DR module, hydrogen-ready, on DR-grade pellets needs DR-grade concentrate and a gas contract
3. As hydro grows Hydrogen blended into the reducing gas needs firm, low-cost hydro and electrolysers
4. Long term Hydrogen DRI and green HBI, also for export needs CBAM-ready MRV and buyers who pay

Source: Cameroon Steel reference configuration RC-1 (planning estimate), reserve module [S90]; analysis in this chapter.

D.7 Chapter 7: climate risk and adaptation

Figure 7.1: monthly rainfall at Kribi

Mean monthly rainfall at Kribi station, 1937 to 1976, in millimetres; annual mean about 2,836 mm.

Table D.24 Values plotted in Figure 7.1, mm per month (sourced)

Month Jan Feb Mar Apr May Jun
mm 92 118 201 261 343 274

Table D.25 Values plotted in Figure 7.1 (continued), mm per month (sourced)

Month Jul Aug Sep Oct Nov Dec
mm 112 231 502 492 201 94

Source: Olivry, Monographie du Nyong et des fleuves côtiers, ORSTOM (1979), homogenised Kribi station record, 1937 to 1976 [S60].

Figure 7.2: one-day rainfall by return period

Station fit from the historical record (sourced), and the same values raised by about 7% per degree of global warming (illustrative uplift).

Table D.26 Values plotted in Figure 7.2, mm in 24 hours (illustrative)

Return period Station fit +1 °C (+7%) +2 °C (+14.5%)
2-year 144 154 165
10-year 193 206 221
50-year 243 260 278
100-year 264 282 302

Source: Kribi station Pearson III fit [S60]; IPCC AR6 WGI, scaling of extreme daily precipitation with warming [S59]. Uplift applied by Cameroon Steel.

Figure 7.3: sea level and shoreline change

Left panel: likely range of global mean sea-level rise by 2100 relative to 1995 to 2014 (IPCC AR6). Right panel: mean rate of shoreline change on the Kribi coast; positive values are accretion, negative values retreat.

Table D.27 Values plotted in Figure 7.3 (left), metres by 2100 (sourced)

Scenario Low end High end
SSP2-4.5 0.44 0.76
SSP5-8.5 0.63 1.01

The figure also marks the low-likelihood, high-impact outcome of up to about 2 m by 2100 [S59].

Table D.28 Values plotted in Figure 7.3 (right), metres per year (sourced)

Period Mean shoreline change
1973 to 2000 +0.4
2000 to 2015 −0.9
2015 to 2020 −2.0

Source: IPCC AR6 WGI Summary for Policymakers [S59]; Fendoung, Tchindjang and Hubert-Ferrari (2022) [S62].

D.8 Chapter 8: circularity

Figure 8.1: intensity against the scrap share

RC-1 Phase 1 intensity including upstream iron units, t CO2 per tonne of product, grid at 226 g/kWh, with the furnace electricity penalty for DRI. The balance of the charge is imported iron units at the stated upstream intensity. Each additional 10 points of scrap changes the intensity by −0.088 t CO2/t with gas-based DRI.

Table D.29 Values plotted in Figure 8.1, t CO2 per tonne of product (derived)

Scrap share of the charge Imported gas-based DRI at 0.7 t/t Hydrogen-based iron units at 0.2 t/t
50% 0.75 0.45
55% 0.71 0.44
60% 0.67 0.42
65% 0.62 0.41
70% 0.58 0.40
75% 0.53 0.38
80% 0.49 0.37
85% 0.45 0.36
90% 0.40 0.34
95% 0.36 0.33

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; DRI power penalty [S15].

Figure 8.2: scrap need against domestic arising

RC-1 annual scrap need at nameplate output (derived) against the only published estimate of domestic scrap arising (2006 data) and the RC-1 planning assumption for domestic supply (range 0 to 60 kt).

Table D.30 Values plotted in Figure 8.2, kt per year

Series kt per year Status
RC-1 scrap need, full build-out 846.2 derived
RC-1 scrap need, Phase 1 253.9 derived
Domestic scrap arising, 2006 study (upper) 61.8 sourced
Domestic scrap arising, 2006 study (lower) 53.0 sourced
RC-1 planning assumption, domestic scrap 30.0 assumed

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; Bidoung et al. (2007), 2006 data [S88].

Figure 8.3: residues and zinc

Annual residues at nameplate output and the zinc contained in the furnace dust at 20% to 30% zinc, in thousand tonnes (kt).

Table D.31 Values plotted in Figure 8.3, kt per year (derived)

Phase EAF and ladle slag Mill scale EAF dust (hazardous) Zinc, low Zinc, high
Phase 1 44.7 6.0 4.8 1.0 1.4
Phases 1+2 74.5 10.0 8.0 1.6 2.4
Full build-out 148.9 20.0 16.0 3.2 4.8

Source: Cameroon Steel reference configuration RC-1 (planning estimate): slag 140 kg/t, dust 15 kg/t, mill scale 20 kg/t [S90]; IFC benchmark for solid residue [S20]; zinc content range [S69]. Derived by Cameroon Steel.

D.9 Chapter 9: finance and standards

Figure 9.1: Scopes 1 and 2 against lender thresholds

Scopes 1 and 2 at nameplate output, kt CO2 per year, at the 2024 grid factor and at the ends of the whisker range. Thresholds: IFC Performance Standard 3, 25 kt; Equator Principles EP4, 100 kt. The minor fuels (diesel, LPG) and switchgear SF6, drawn as a pale segment, are not in the RC-1 balances; their values are assumed (Annex A).

Table D.32 Values plotted in Figure 9.1, kt CO2 per year, Scopes 1+2 (derived)

Phase Grid 226 g/kWh (bar) Grid 96 g/kWh Grid 300 g/kWh Minor fuels and SF6, central (range)
Phase 1 97.2 59.7 118.6 4.9 (3.3 to 6.6)
Phases 1+2 163.1 108.3 194.3 8.1 (5.4 to 10.9)
Full build-out 327.7 229.7 383.4 16.1 (10.7 to 21.5)

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; IFC Performance Standard 3 [S21]; Equator Principles EP4 [S22].

Figure 9.2: sliding-scale thresholds

Thresholds in t CO2e per tonne of crude steel as functions of the scrap share of the metallic input, computed with the formulas used to draw the figure: IEA near-zero threshold 0.40 minus 0.35 times the scrap share; ResponsibleSteel Progress Level 1 interpolated linearly between 2.34 at 20% scrap and 0.96 at 80% scrap (not defined outside that interval).

Table D.33 Threshold lines plotted in Figure 9.2, t CO2e per tonne of crude steel (sourced)

Scrap share ResponsibleSteel Progress Level 1 IEA near-zero threshold
0% not defined 0.40
10% not defined 0.37
20% 2.34 0.33
30% 2.11 0.30
40% 1.88 0.26
50% 1.65 0.23
60% 1.42 0.19
70% 1.19 0.16
80% 0.96 0.12
90% not defined 0.09
100% not defined 0.05

RC-1 Phase 1 position (derived): 0.54 t CO2 per tonne of crude steel at about 70% scrap, against 1.19 for Progress Level 1 and 0.16 for the near-zero threshold at the same scrap share.

Source: IEA (2022) [S06]; ResponsibleSteel, Decarbonisation Progress Levels (2024) [S37]; WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90].

D.10 Chapter 10: pathway and recommendations

Figure 10.1: illustrative decarbonisation pathway

RC-1 at 1 Mtpa, levers applied cumulatively, t CO2 per tonne of product including upstream iron units. The IEA near-zero threshold at 75% scrap, converted to a per-tonne-of-product basis, is 0.15.

Table D.34 Values plotted in Figure 10.1, t CO2 per tonne of product (illustrative)

Step (cumulative) Change Total after the step of which Scopes 1+2
RC-1 at 1 Mtpa (base) 0.582 0.328
Melt-shop and mill efficiency −0.013 0.569 0.315
Lower direct carbon −0.021 0.547 0.293
Efficient reheating −0.006 0.541 0.287
Grid at 100 g/kWh −0.088 0.454 0.200
More scrap in the charge (domestic or imported) −0.043 0.411 0.199
Lower-carbon DRI, 0.5 t/t −0.060 0.350 0.199
Hydrogen-based iron, 0.2 t/t −0.091 0.260 0.199

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; DRI power penalty [S15]; hydrogen-based iron intensity derived from [S15]; IEA near-zero threshold [S06].

Figure 10.2: an indicative trajectory

Years are indicative and are not commitments. The figure also draws the worldsteel scrap-EAF world average of 0.69 t CO2 per tonne of crude steel.

Table D.35 Values plotted in Figure 10.2, t CO2 per tonne of product (illustrative)

Year Point Including upstream iron units Scopes 1+2
2031 Phase 1 at nameplate 0.58 0.32
2035 1 Mtpa, base 0.58 0.33
2038 known levers 0.35 0.20
2042 hydrogen-based iron units 0.26 0.20

Source: WP06 model on the Cameroon Steel reference configuration RC-1 (planning estimate) [S90]; phasing from the RC-1 indicative schedule [S90]; worldsteel scrap-EAF average [S01].

本章引用的资料来源

方括号内的标记对应以下来源(按原文语言列出),完整列表见附录。 完整来源列表

  1. S01Sustainability Indicators 2025 report (2024 data; route table added February 2026). worldsteel,2025年11月;更新:2026年2月.worldsteel.org/wider-sustainability/sustainability-indicators/
  2. S90Cameroon Steel reference configuration RC-1 (planning estimate): phases, planning values, balances and indicative schedule, edition 10 October 2026. Cameroon Steel,2026年10月10日.按标题和日期引用
  3. S05Iron and Steel Technology Roadmap. International Energy Agency,2020年10月.iea.blob.core.windows.net/assets/eb0c8ec1-3665-4959-97d0-187ceca189a8/…
  4. S03World Steel in Figures 2026. worldsteel,2026年6月4日.worldsteel.org/data/world-steel-in-figures/world-steel-in-figures-2026…
  5. S14Pedal to the Metal 2026. Global Energy Monitor,2026年5月.globalenergymonitor.org/sites/default/files/2026-05/Pedal%20to%20the%2…
  6. S45GHG Protocol Corporate Standard (2004) and Scope 2 Guidance (2015). World Resources Institute and WBCSD,2004年;2015年.ghgprotocol.org/corporate-standard
  7. S22The Equator Principles EP4. Equator Principles Association,2020年7月(生效:2020年10月1日).equator-principles.com/app/uploads/The-Equator-Principles_EP4_July2020…
  8. S27Regulation (EU) 2023/956 establishing a carbon border adjustment mechanism, Annexes I and II. Official Journal of the EU, L 130,2023年5月16日.eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:32023R0956
  9. S41ISO 14404-1:2024 and ISO 14404-2:2024, Calculation method of carbon dioxide emission intensity from iron and steel production, Parts 1 and 2. International Organization for Standardization,2024年9月.iso.org/standard/88111.html
  10. S43ISO 14404-4:2020, Part 4: Guidance for using the ISO 14404 series. International Organization for Standardization,2020年.iso.org/standard/77622.html
  11. S37The Decarbonisation Progress Levels. ResponsibleSteel,2024年9月23日.responsiblesteel.org/resources/the-decarbonisation-progress-levels
  12. S06Achieving Net Zero Heavy Industry Sectors in G7 Members. International Energy Agency,2022年5月19日.iea.blob.core.windows.net/assets/c4d96342-f626-4aea-8dac-df1d1e567135/…
  13. S46ISO 14067:2018, Greenhouse gases: carbon footprint of products. International Organization for Standardization,2018年.iso.org/standard/71206.html
  14. S47ISO 14025:2006, Environmental labels and declarations, Type III; EN 15804:2012+A2:2019, core rules for construction products. ISO;European Committee for Standardization (CEN),2006年;2019年.iso.org/standard/38131.html
  15. S48Carbon intensity of electricity generation (Ember data). Our World in Data,数据集访问于2026年10月10日.ourworldindata.org/grapher/carbon-intensity-electricity
  16. S50Rapport d’activités 2025 de l’ARSEL. ARSEL (electricity regulator, Cameroon),2026年9月7日.arsel-cm.org/wp-content/uploads/2026/09/Rapport-ARSEL-2025.pdf
  17. S49Electricity production by source (Ember and Energy Institute data). Our World in Data,数据集访问于2026年10月10日.ourworldindata.org/grapher/electricity-prod-source-stacked
  18. S58Climate Change 2014: Mitigation, Annex III: Technology-specific cost and performance parameters. IPCC Working Group III,2014年.ipcc.ch/site/assets/uploads/2018/02/ipcc_wg3_ar5_annex-iii.pdf
  19. S15ENERGIRON technology: DRI-EAF production route using natural gas or H2. European Commission, Innovation Centre for Industrial Transformation,引用:2026年2月12日.innovation-centre-for-industrial-transformation.ec.europa.eu/innovativ…
  20. S28Directive (EU) 2023/959 amending the EU Emissions Trading System Directive. Official Journal of the EU, L 130,2023年5月16日.eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32023L0959
  21. S31EU Commission finalizes CBAM benchmarks, default values ahead of January 2026 launch. EUROMETAL,2025年12月.eurometal.net/eu-commission-finalizes-cbam-benchmarks-default-values-a…
  22. S26Price of CBAM certificates. European Commission, DG TAXUD,最近更新:2026年10月5日.taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism/price…
  23. S104CBAM legislation and guidance: implementing acts, including Implementing Regulation (EU) 2025/2620 (benchmarks) and Implementing Regulation (EU) 2025/2621 (default values). European Commission, DG TAXUD.taxation-customs.ec.europa.eu/carbon-border-adjustment-mechanism/cbam-…
  24. S18DRI-EAF implementation at Saarstahl and Dillinger steelworks (POWER4STEEL). European Commission, Innovation Centre for Industrial Transformation,引用:2025年7月.innovation-centre-for-industrial-transformation.ec.europa.eu/innovativ…
  25. S132025 World Direct Reduction Statistics. Midrex Technologies,2026年9月.midrex.com/world-dri-statistics/world-dri-production-reaches-151-0-mt-…
  26. S17Hydrogen uses in ironmaking (Midrex presentation, H2@Scale). US Department of Energy,2018年8月1日.energy.gov/sites/prod/files/2018/08/f54/fcto-h2-scale-kickoff-2018-8-c…
  27. S52Énergie: Nachtigal franchit le cap des 3,6 TWh injectés dans le réseau en un an. Journal du Cameroun,2026年6月15日.fr.journalducameroun.com/energie-nachtigal-franchit-le-cap-des-36-twh-…
  28. S53Cameroon: Energy (Country Commercial Guide). US International Trade Administration,2026年4月13日.trade.gov/country-commercial-guides/cameroon-energy
  29. S60Monographie du Nyong et des fleuves côtiers, Tome 1 (J.-C. Olivry). ORSTOM,1979年7月.horizon.documentation.ird.fr/exl-doc/pleins_textes/divers11-03/01948.p…
  30. S59Climate Change 2021: The Physical Science Basis, Summary for Policymakers. IPCC Working Group I,2021年.ipcc.ch/report/ar6/wg1/downloads/report/IPCC_AR6_WGI_SPM.pdf
  31. S62Weakening of coastlines and coastal erosion in the Gulf of Guinea: the case of the Kribi coast (Fendoung, Tchindjang and Hubert-Ferrari), Land 11:1557. MDPI,2022年.doi.org/10.3390/land11091557
  32. S88La récupération et le recyclage des déchets ferromagnétiques: analyse de la situation au Cameroun (Bidoung, Fomethe, Yantio, Melo), Déchets: revue francophone d’écologie industrielle no. 48. ENSP Yaoundé / MIPROMALO (Episciences),2007年第四季度.eid.episciences.org/7942/pdf
  33. S20Environmental, Health, and Safety Guidelines for Integrated Steel Mills. IFC / World Bank Group,2007年4月30日.ifc.org/content/dam/ifc/doc/2000/2007-integrated-steel-mills-ehs-guide…
  34. S69Recycling of electric arc furnace dust (zinc recovery, Waelz process). Galvanizers Association,未注明日期,访问于2026年10月10日.galvanizing.org.uk/?p=32698
  35. S21Performance Standards on Environmental and Social Sustainability. IFC,2012年1月1日.ifc.org/en/insights-reports/2012/ifc-performance-standards