联系

从矿产资源到工业价值

白皮书05 · 附录D · 英文原文

数据表

Data tables

阅读(英文)
11分钟
篇幅(英文)
2596词
版本日期
2026年10月10日

本附录未收入中文摘要版,以下为英文原文。

本章目录(11)
  1. D.1 Executive summary
  2. D.2 Chapter 1, energy in steel economics
  3. D.3 Chapter 2, Cameroon’s power system
  4. D.4 Chapter 3, tariffs and contracting
  5. D.5 Chapter 4, power quality for arc furnaces
  6. D.6 Chapter 5, Kribi’s power infrastructure
  7. D.7 Chapter 6, natural gas
  8. D.8 Chapter 7, gas for direct reduction
  9. D.9 Chapter 8, renewables and storage
  10. D.10 Chapter 9, an energy plan for an electric steelworks
  11. D.11 Chapter 10, policy recommendations

This annex gives the values plotted in every chart of this paper, with units, status and sources, so that readers can check or reuse the numbers without the charts. The same values are published as data files with the web edition, and the charts are generated from them by script (Annex A). Diagrams are summarised rather than tabulated. Statuses follow the convention of Annex A: sourced, derived, assumed or illustrative.

D.1 Executive summary

Table D.1 Data for Figure ES.1: Phase 1 fits the port substation’s shared first 100 MW; 1 Mtpa needs its later stage (status: derived)

Item Value Unit Status
RC-1 Phase 1 (0.3 Mtpa), average load 36.1 to 37.7 MW planned (derived)
RC-1 Phase 1, maximum demand 55 (45 to 65) MVA assumed
RC-1 Phases 1 and 2 (0.5 Mtpa), average load 52.7 to 55.4 MW planned (derived)
RC-1 full build-out (1 Mtpa), average load 94.1 to 99.5 MW planned (derived)
RC-1 full build-out, maximum demand 160 (130 to 190) MVA assumed
Port substation, first stage, shared by the whole port platform 100 MW sourced
Port substation, later stage 330 to 400 MW sourced
Kribi gas plant, installed 216 MW sourced
Kribi gas plant, 2025 average output 63.9 MW derived
Industrial demand unmet in Cameroon, October 2026 150 MW sourced

Source: Cameroon Steel reference configuration RC-1 (planning estimate) [S07], average loads at 450 to 490 kWh/t in the furnace; PAK [S14][S15]; ARSEL 2025 [S01]; Business in Cameroon, 9 October 2026 [S02].

D.2 Chapter 1, energy in steel economics

Table D.2 Data for Figure 1.1: Scrap-fed electric steel needs 10% to 40% of the energy of ore-based routes (status: sourced)

Route worldsteel 2024 data (GJ/t crude steel) IEA 2019, final energy (GJ/t)
Blast furnace and oxygen converter (BF-BOF) 23.88 21.4
Gas DRI and electric arc furnace (DRI-EAF) 23.30 17.1
Scrap and electric arc furnace (scrap-EAF) 9.84 2.1

Source: worldsteel [S34]; IEA [S35].

Table D.3 Data for Figure 1.2: Melting is the largest electricity use: 350 to 500 kWh per tonne of liquid steel in a modern furnace (status: sourced)

Process step Low High RC-1 planning value Unit Basis
EAF melting, IFC benchmark 347 500 450 (upper 490) kWh/t liquid IFC 2007
EAF melting, EU melt shops observed 404 748 n/a kWh/t liquid EU BREF 2013
EAF with continuous scrap charging (one plant) 321 321 n/a kWh/t liquid EC ICIT
Extra EAF power at 100% DRI in the charge 0 145 n/a kWh/t liquid derived
Ladle furnace, caster and auxiliaries 50 100 70 kWh/t liquid assumed
Induction billet heating (Phase 1) 150 400 300 kWh/t billet assumed
Rolling (bars, rod, sections) 70 140 110 kWh/t product IFC 2007
Direct-reduction plant electricity 60 73 n/a kWh/t DRI Energiron

Source: [S36][S37][S38][S39][S07]; upper value derived (Annex A).

D.3 Chapter 2, Cameroon’s power system

Table D.4 Data for Figure 2.1: Hydro supplied nine-tenths of Cameroon’s electricity in 2025 (status: sourced)

Source GWh, 2025 Share (%)
Hydro 7,272.4 89.6
Natural gas 559.7 6.9
Light fuel oil 153.9 1.9
Solar 67.2 0.8
Heavy fuel oil 66.7 0.8
Total 8,119.9 100.0

Source: ARSEL 2025 [S01].

Table D.5 Data for Figure 2.2: Cameroon has 755 MW of capacity above its peak, yet 150 MW of industrial demand is unserved (status: sourced)

Item Value Unit Status
Installed capacity, 2025 2,033 MW sourced
of which hydro (69.5% of capacity) 1,413 MW derived
Peak demand, 2025 1,278 MW sourced
Industrial demand unmet, October 2026 150 MW sourced
Nachtigal hydro (420 MW): planned 2025 2,875.9 GWh derived
Memve’ele hydro (211 MW): planned 2025 243.2 GWh derived
Kribi gas (216 MW): planned 2025 1,031.2 GWh sourced
Nachtigal hydro (420 MW): delivered 2025 2,070.7 GWh sourced
Memve’ele hydro (211 MW): delivered 2025 557.0 GWh sourced
Kribi gas (216 MW): delivered 2025 559.7 GWh sourced

Source: ARSEL 2025 [S01]; ARSEL forecast decision 2025 [S63]; Business in Cameroon [S02].

Table D.6 Data for Figure 2.3: Kribi sits at the southern end of the hydro-based southern grid (status: sourced)

Plant or feature Type (OSM tag) Capacity (MW) or count
Song Loulou hydro 384
Edéa hydro 276
Nachtigal hydro 420
Memve’ele hydro 211
Kribi gas plant (KPDC) gas 216
Dibamba oil 86
Limbé oil 85
Logbaba gas 30
High-voltage line segments mapped (225 or 220 kV) 54
Other line segments mapped 61

Source: OpenStreetMap contributors, extract of 10 October 2026 [S60].

D.4 Chapter 3, tariffs and contracting

Table D.7 Data for Figure 3.1: No price is published for a 50 MW load: the benchmarks span 18 to 105 FCFA/kWh (status: derived)

Benchmark FCFA/kWh US$/kWh at 600 FCFA Status
Transmission charge only, 100 MW at 80% load factor (2025) 2.70 0.005 derived
Legacy high-voltage contracts, average realised (2025) 18.40 0.031 derived
Medium-voltage 9 to 10 MW band, >400 h/month, all-in (2026) 43.70 0.073 derived
Memve’ele hydro, purchase price paid by the utility 43.93 0.073 sourced
Medium-voltage customers, average realised (2025) 85.70 0.143 derived
Regulator’s cost-reflective average (2025) 105.46 0.176 sourced

Source: [S01][S03][S04][S53].

Table D.8 Data for Figure 3.2: Under a capacity-plus-energy tariff, a peaky load pays about a third more per kWh (status: derived)

Hours per month at subscribed power All-in FCFA/kWh, 2026 Note
200 139.0
300 98.9
400 78.8
401 63.4
461 56.7 RC-1 Phase 1 shape
500 53.2
600 46.4
667 42.9 flat load, 8,000 h/yr
720 40.6

Source: ARSEL MV tariff tables, 9 to 10 MW band, escalated by 1.331 to 2026 [S03]; Cameroon Steel reference configuration RC-1 (planning estimate) [S07]; derived.

D.5 Chapter 4, power quality for arc furnaces

Table D.9 Data for Figure 4.1: An arc furnace draws power in violent pulses, worst during bore-in (status: illustrative)

Phase Start (min) End (min) Mean power (MW) Random variation
bore-in 0 4 20 35%
melting 4 20 27 14%
charge 20 23 0 0%
bore-in 23 27 20 35%
melting 27 39 27 14%
refining 39 47 24 4%
tap and turnaround 47 60 0 0%
Energy per heat 17.86 MWh

Source: Cameroon Steel illustration from RC-1 values [S07].

Table D.10 Data for Figure 4.2: The arc furnace and its compensator share one busbar, behind a strong 225 kV connection (status: illustrative)

Diagram element Summary
Voltages Point of common coupling at 225 kV; plant busbar at 33 kV
Feeders shown EAF of the 40 t class (transformer of the 30 to 33 MVA class); ladle furnace; SVC or STATCOM and filters; rectifiers and inverters; auxiliary transformers

Source: Cameroon Steel reference configuration RC-1 (planning estimate) [S07]; illustrative diagram.

Table D.11 Data for Figure 4.3: A furnace of the 30 to 33 MVA class needs a 2,000 to 7,000 MVA connection to stay within flicker limits (status: derived)

Short-circuit power at PCC (MVA) Pst99, uncompensated Pst99, with SVC (factor 0.5)
500 6.4 to 11 3.2 to 5.6
1,000 3.2 to 5.6 1.6 to 2.8
1,500 2.1 to 3.7 1.1 to 1.9
2,000 1.6 to 2.8 0.8 to 1.4
3,000 1.1 to 1.9 0.53 to 0.93
4,000 0.8 to 1.4 0.4 to 0.7
5,000 0.64 to 1.1 0.32 to 0.56
6,000 0.53 to 0.93 0.27 to 0.47
8,000 0.4 to 0.7 0.2 to 0.35

Source: simplified screening relation (Annex A); Kst 48 to 85 according to the UIE, as cited in [S12]; SscF about twice the rating of a transformer of the 30 to 33 MVA class (assumed); planning level 0.8 [S13]; derived from the requirement rounded to one significant figure (Pst99 = 0.8 x requirement / short-circuit power).

D.6 Chapter 5, Kribi’s power infrastructure

Table D.12 Data for Figure 5.1: A dedicated 225 kV line will bring firm supply 42 km from the Kribi gas plant to the port (status: sourced)

Feature Value
225 kV line, Kribi gas plant to port 42 km, double circuit
Port substation 225/30 kV, 3 x 60 MVA
Capacity, first stage 100 MW
Capacity, later stage 330 to 400 MW
Kribi gas plant 216 MW, 13 dual-fuel engines

Source: PAK [S14][S15]; Engineering News [S64]; OpenStreetMap [S60].

Table D.13 Data for Figure 5.2: A dedicated 225 kV connection keeps the furnace’s disturbances off the zone’s shared network (status: illustrative)

Option Characteristics shown
A. Medium-voltage feeder PCC at 30 kV, shared with other zone tenants; Weak fault level: flicker spreads to neighbours; Uses part of the first 100 MW
B. Dedicated 225 kV bay PCC at 225 kV: highest fault level available; Own SVC/STATCOM and filters; Fits Phase 1; expandable
C. Option B plus firm gas-fired back-up Covers hydro shortfalls and line outages; Gas allocation needed; Higher cost per kWh; best reliability

Source: Cameroon Steel analysis; PAK [S14].

D.7 Chapter 6, natural gas

Table D.14 Data for Figure 6.1: Hilli’s exit removes a 72 bcf/yr buyer; plausible uses at Kribi total about 20 to 36 bcf/yr (status: derived)

Item bcf per year Status
Field production, 2025 75.5 sourced
Sales 2025: LNG feed (Hilli FLNG) 71.6 sourced
Sales 2025: Kribi power plant 4.9 sourced
Sales 2025: Industrial buyer, Kribi (July to December 2025) 3.1 sourced
Candidate use: Kribi plant, 2025 dispatch 4.9 sourced
Candidate use: Kribi plant, 216 MW at 80% 13.3 derived
Candidate use: Kribi plant, 330 MW licence 20.3 derived
Candidate use: Industrial buyer, annualised 6.2 derived
Candidate use: RC-1 reheating at 1 Mtpa 0.8 derived
Candidate use: 1 Mtpa gas DRI module 8.4 to 9.1 derived
Total of candidate uses without DRI 20.3 derived
Total with plant at 330 MW and 1 Mtpa DRI 36.5 derived

Source: SNH 2025 [S05]; ARSEL 2025 [S01]; Cameroon Steel reference configuration RC-1 (planning estimate) [S07]; [S39][S41]; derived.

Table D.15 Data for Figure 6.2: Power-sector gas sold at about US$3.2/Mscf in 2025, industry paid about US$5.0 to 5.6 (status: derived)

Buyer or item Low (US$/Mscf) High (US$/Mscf) SNH stated (US$/Mscf)
Kribi power plant (KPDC) 2.90 3.30 3.2
Industrial buyer at Kribi 5.00 5.60 5.6
LNG feed, State share sold to the offtaker 7.64 8.97 n/a
Special petroleum tax on gas, 70 FCFA/m3 (if applied) 3.20 3.50 n/a

Source: SNH 2025 [S05][S92]; [S87]; derived conversions.

D.8 Chapter 7, gas for direct reduction

Table D.16 Data for Figure 7.1: A 1 Mtpa DRI plant would burn about 9 bcf a year, nearly twice the Kribi power plant’s 2025 use (status: derived)

Use bcf per year Share of 2025 output Status
Kribi power plant, 2025 actual 4.9 sourced
0.25 Mtpa DRI module 2.1 to 2.3 2.8% to 3.0% derived
0.5 Mtpa DRI module 4.2 to 4.6 5.6% to 6.1% derived
1.0 Mtpa DRI module 8.4 to 9.1 11.1% to 12.1% derived
2.5 Mtpa DRI module 21.0 to 22.9 27.9% to 30.3% derived

Source: [S39][S41][S94][S05]; derived.

Table D.17 Data for Figure 7.2: At Cameroonian gas prices, fuel costs US$27 to US$51 per tonne of DRI (status: derived)

Gas price (US$/Mscf) or reference Gas cost (US$ per t DRI)
2.00 17 to 18
3.20 27 to 29
4.00 34 to 37
5.60 47 to 51
7.00 59 to 64
8.97 75 to 82
10.00 84 to 91
12.00 101 to 110
Traded HBI, CFR Italy, March 2026 340 to 370 (price per tonne)
Brazilian pig iron, FOB, September 2026 445 (price per tonne)

Source: [S05][S39][S41][S18][S99]; derived.

D.9 Chapter 8, renewables and storage

Table D.18 Data for Figure 8.1: Cameroon’s grid emits half the world average per kWh and a third of Indonesia’s (status: sourced)

Country or region g CO₂e/kWh, 2024
Ethiopia 23
Brazil 106
European Union 211
Cameroon 226
Côte d’Ivoire 405
Türkiye 470
World 471
Nigeria 496
Gabon 523
Africa 544
China 555
Egypt 574
Algeria 633
Indonesia 680
India 705
South Africa 717

Source: Our World in Data, Ember data [S10].

Table D.19 Data for Figure 8.2: A solar plant at Kribi would yield about 1,335 kWh per kWp a year, a 15% capacity factor (status: sourced)

Month kWh per kWp
Jan 138.2
Feb 124.9
Mar 124.2
Apr 113.3
May 105.3
Jun 93.1
Jul 93.1
Aug 98.7
Sep 96.8
Oct 102.3
Nov 111.0
Dec 133.7
Year 1,334.7

Source: JRC PVGIS v5.3 [S19]; capacity factor 15.2%; optimal slope 6 degrees.

Table D.20 Data for Figure 8.3: A 50 MWp solar array would cover Phase 1 load only around midday (status: illustrative)

Hour (West Africa Time) Phase 1 load, illustrative (MW) 50 MWp solar, January (MW) 50 MWp solar, July (MW)
00:00 36.4 0.0 0.0
01:00 36.6 0.0 0.0
02:00 36.6 0.0 0.0
03:00 37.1 0.0 0.0
04:00 36.2 0.0 0.0
05:00 36.2 0.0 0.0
06:00 36.6 0.0 0.0
07:00 36.8 2.4 3.0
08:00 36.9 9.8 8.4
09:00 34.8 18.5 13.8
10:00 35.5 24.9 18.1
11:00 36.6 28.7 18.9
12:00 36.1 30.8 19.9
13:00 35.8 32.3 20.8
14:00 36.0 29.7 20.0
15:00 36.8 24.5 16.6
16:00 36.0 16.7 12.8
17:00 35.4 8.7 7.5
18:00 35.4 1.1 1.5
19:00 35.6 0.0 0.0
20:00 35.7 0.0 0.0
21:00 35.8 0.0 0.0
22:00 34.6 0.0 0.0
23:00 36.1 0.0 0.0

Source: [S19]; Cameroon Steel reference configuration RC-1 (planning estimate) [S07]; illustrative.

D.10 Chapter 9, an energy plan for an electric steelworks

Table D.21 Data for Figure 9.1: Electricity demand rises from 0.29 TWh in Phase 1 to 0.75 TWh at 1 Mtpa; melting is half to two-thirds of the total (status: derived)

End use (MWh per year) Phase 1 Phases 1 and 2 Full build-out
EAF melting 143,617 239,362 478,723
Ladle furnace, caster and auxiliaries 22,340 37,234 74,468
Induction billet heating (Phase 1 mills) 90,000 90,000 90,000
Rolling 33,000 55,000 110,000
Total 288,957 421,596 753,192
Total at the upper value of about 490 kWh/t in the furnace 301,723 442,872 795,745

Source: Cameroon Steel reference configuration RC-1 (planning estimate) [S07]; derived.

Table D.22 Data for Figure 9.2: Phase 1 load would swing between about 16 and 51 MW within each hour (status: illustrative)

Period of the illustrative day Mean of 15-minute averages (MW) Highest 15-minute average (MW) Lowest 15-minute average (MW)
00:00 to 06:00, normal operation 36.6 47.3 20.1
06:00 to 08:00, mill roll change 21.9 33.0 4.9
08:00 to 13:00, normal operation 36.0 47.2 16.6
13:00 to 14:30, furnace maintenance 20.0 26.0 16.8
14:30 to 24:00, normal operation 36.0 44.4 18.1
One-minute values, normal hours 36.2 51.4 (99th pct.) 16.4 (5th pct.)

Source: Cameroon Steel illustration from RC-1 benchmarks [S07]; furnace active power capped at about 30 MW; not a forecast.

D.11 Chapter 10, policy recommendations

Table D.23 Data for Figure 10.1: The energy milestones Cameroon and an electric steelworks must meet, 2026 to 2036 (status: illustrative)

Group Milestone Year(s) Status
Grid 400 kV Nachtigal evacuation line due 2026 sourced
Grid 225 kV KPDC-port line and substation due 2026 sourced
Grid Kikot-Mbebe hydro 500 MW expected 2031 to 2033 sourced
Gas Hilli FLNG leaves Kribi 2026 sourced
Gas Gas allocation for Kribi industry (recommended) 2027 recommended
Carbon EU CBAM certificates on sale 2027 sourced
Carbon EU free allocation phased out 2026 to 2033 sourced
Rules Large-user tariff and wheeling framework (recommended) 2027 recommended
Rules Grid code for fluctuating loads (recommended) 2027 recommended
RC-1 Utilities agreements; environmental certificate 2027 to 2028 target
RC-1 Phase 1 works from Q1 2029 2029 to 2030 target
RC-1 First heat H2 2030; ramp-up 2030 to 2031 target
RC-1 Phase 2 (sections) 2032 to 2034 indicative
RC-1 Phase 3, DRI module later After 2034 (drawn 2035 to 2036) indicative

Source: [S02][S14][S68][S16][S108][S109][S07].

本章引用的资料来源

方括号内的标记对应以下来源(按原文语言列出),完整列表见附录。 完整来源列表

  1. S07Cameroon Steel reference configuration RC-1 (planning estimate), edition 10 October 2026 (RC-1.1): phases, benchmarks with ranges, indicative balances and schedule. Cameroon Steel,2026年10月10日.按标题和日期引用
  2. S14Kribi franchit la ligne électrique 225 kV. PAK,2025年8月6日.按标题和日期引用
  3. S15Énergie et infrastructures: un nouvel élan pour la compétitivité du Port de Kribi. PAK,2026年8月19日.按标题和日期引用
  4. S01Rapport d’activités 2025 de l’ARSEL. ARSEL (electricity regulator),2026年9月7日.arsel-cm.org/wp-content/uploads/2026/09/Rapport-ARSEL-2025.pdf
  5. S02Nachtigal power line delays leave 150 MW of industrial demand unmet. Business in Cameroon,2026年10月9日.businessincameroon.com/public-management/0910-16939-nachtigal-power-li…
  6. S34Sustainability Indicators 2025 report. worldsteel,2025年11月(更新:2026年2月).worldsteel.org/zh-hans/wider-sustainability/sustainability-indicators/…
  7. S35Iron and Steel Technology Roadmap. IEA,2020年10月.iea.blob.core.windows.net/assets/eb0c8ec1-3665-4959-97d0-187ceca189a8/…
  8. S36Environmental, Health, and Safety Guidelines for Integrated Steel Mills. IFC / World Bank Group,2007年4月30日.ifc.org/content/dam/ifc/doc/2000/2007-integrated-steel-mills-ehs-guide…
  9. S37Best Available Techniques Reference Document, Iron and Steel (EUR 25521). EC JRC,2013年.bureau-industrial-transformation.jrc.ec.europa.eu/sites/default/files/…
  10. S38Enhanced EAF steelmaking through continuous charging (Consteel). EC ICIT,未注明日期,访问于2026年10月.innovation-centre-for-industrial-transformation.ec.europa.eu/innovativ…
  11. S39ENERGIRON technology (DRI-EAF with natural gas or H₂). EC ICIT,引用:2026年2月12日.innovation-centre-for-industrial-transformation.ec.europa.eu/innovativ…
  12. S63Décision N°0000018D (prévisionnelle 2025). ARSEL,2025年1月17日.arsel-cm.org/wp-content/uploads/2025/12/2025_decision_n0000018d_arsel_…
  13. S60OpenStreetMap power features (lines, substations, plants), southern Cameroon, via the Overpass API; Kribi base extract (coast, roads, land use). OpenStreetMap contributors (ODbL),提取:2026年7月24日、2026年10月10日.openstreetmap.org
  14. S03Tableaux tarifaires, Décision ARSEL N°00000427 (MT 2023-2025). ARSEL,上传:2026年1月.arsel-cm.org/wp-content/uploads/2026/01/TABLEAUX-TARIFAIRES-decision-M…
  15. S04Décision fixant le montant de la RMA ENEO au titre de l’exercice 2025 (réajustée). ARSEL,2025年12月19日.arsel-cm.org/wp-content/uploads/2026/01/Decision-fixant-le-Montant-de-…
  16. S53Tarif transport et GRT (Décision 0000017D). ARSEL,2025年1月17日.arsel-cm.org/wp-content/uploads/2026/01/TARIF-TRANSPORT-ET-GRT-1.pdf
  17. S12US Patent 10,145,612: Flicker reduction in electric arc furnaces by means of flicker prediction from the state determination in the initial phase of the smelting process. Siemens (assignee now Siemens Energy Global),授予:2018年12月4日.patents.google.com/patent/US10145612
  18. S13IEC TR 61000-3-7:2008, Electromagnetic compatibility, Part 3-7: Assessment of emission limits for the connection of fluctuating installations to MV, HV and EHV power systems (Ed. 2.0); indicative planning levels for flicker: Table 2 (section 4.2.1). International Electrotechnical Commission (table title read in the preview on the VDE Verlag site;values checked against secondary reproductions),2008年.vde-verlag.de/iec-normen/preview-pdf/info_iectr61000-3-7{ed2.0}en.pdf
  19. S64Wärtsilä to upgrade Cameroon-based Kribi power plant to boost reliability. Engineering News,2022年8月22日.engineeringnews.co.za/article/wrtsil-to-upgrade-cameroon-based-kribi-p…
  20. S05Données pétrolières 2025. SNH,发布:2026年6月.snh.cm/wp-content/uploads/2026/06/Donnees-petrolieres-2025.pdf
  21. S41Suez Steel sets new benchmark in energy consumption for DRI production. Danieli,2026年4月16日.danieli.com/en/news-media/news/suez-steel-sets-new-benchmark-energy-co…
  22. S92Chiffres-clés du 1er janvier au 31 décembre 2025. SNH,2026年6月20日.snh.cm/chiffres-cles-du-1er-janvier-au-31-decembre-2025/
  23. S87Industrial gas: Cameroon suspends GDC’s 20% price hiking plan. Business in Cameroon,2023年7月18日.businessincameroon.com/energy/1807-13291-industrial-gas-cameroon-suspe…
  24. S942025 World Direct Reduction Statistics. Midrex Technologies,2026年9月.midrex.com/world-dri-statistics/world-dri-production-reaches-151-0-mt-…
  25. S18European buyers uninterested in BPI and HBI purchases, prices up nominally due to freight. SteelOrbis,2026年3月16日.steelorbis.com/steel-prices/steel-prices-market-analyses/scrap-and-raw…
  26. S99Average prices for Brazilian pig iron fell by $20/t in September. GMK Center,2026年10月4日.gmk.center/?p=129748
  27. S10Carbon intensity of electricity generation (Ember data). Our World in Data,数据集访问于2026年10月.ourworldindata.org/grapher/carbon-intensity-electricity
  28. S19PVGIS v5.3 web services (PVcalc, DRcalc), Kribi 2.94 N 9.91 E, PVGIS-SARAH3 2005 to 2023. European Commission, Joint Research Centre.re.jrc.ec.europa.eu/api/v5_3/
  29. S68Government, EDF push to deliver hydro promises as Cameroon moves to diversify energy sources. Business in Cameroon,2025年12月4日.businessincameroon.com/energy/0412-15443-government-edf-push-to-delive…
  30. S16Le navire usine quitte le Cameroun, le gaz s’arrête. Camer.be,2026年7月9日.camer.be/93911/12:1/le-navire-usine-quitte-le-cameroun-le-gaz-sarrete-…
  31. S108EU adopts CBAM Omnibus Regulation. EY,2025年10月22日.ey.com/en_gl/technical/tax-alerts/eu-adopts-cbam-omnibus-regulation
  32. S109Directive (EU) 2023/959 (EU ETS revision). EUR-Lex (OJ L 130),2023年5月16日.eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32023L0959

引用本章

Cameroon Steel(2026)。喀麦隆水电主导的电网可为低碳钢铁供电,前提是大用户获得稳定供电、明确电价和天然气(中文摘要版)。白皮书05,附录D:数据表。CS-WP-05。https://www.cameroon-steel.com/zh/library/energy-for-industry/annex-data/